{"id":2571,"date":"2026-07-26T09:00:00","date_gmt":"2026-07-26T01:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2571"},"modified":"2026-08-24T18:09:16","modified_gmt":"2026-08-24T10:09:16","slug":"colocation-data-center-tenant-power-quality","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/de\/blog\/colocation-data-center-tenant-power-quality\/","title":{"rendered":"Colocation Data Center Power Quality: Shared Bus Planning"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>In a colocation data center, tenants share medium- and low-voltage buses, so one tenant&#x27;s rectifier load can shape the power quality another tenant sees.<\/strong> Planning shared-bus mitigation starts with defining the bus boundary, metering tenant feeders and the PCC separately, and agreeing who owns which measurement before any APF or SVG discussion begins.<\/p>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Inhalt<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#define-the-electrical-boundary-before-collecting-data\">Definieren Sie die elektrische Grenze vor der Datenerfassung<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#separate-harmonic-planning-from-other-electrical-questions\">Oberschwingungsplanung von anderen elektrischen Fragen trennen<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#compare-mitigation-paths-without-defaulting-to-one-device\">Vergleichen Sie die Minderungswege, ohne sich auf ein bestimmtes Ger\u00e4t festzulegen<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#plan-integration-and-commissioning-early\">Integration und Inbetriebnahme fr\u00fchzeitig planen<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#rfq-checklist-and-fit-boundary\">RFQ-Checkliste und Passgrenze<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">Direkte Antwort<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">In a colocation data center, tenants share medium- and low-voltage buses, so one tenant&#8217;s rectifier load can shape the power quality another tenant sees. Planning shared-bus mitigation starts with defining the bus boundary, metering tenant feeders and the PCC separately, and agreeing who owns which measurement before any APF or SVG discussion begins.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This matters because harmonic-current questions, reactive-power questions, voltage events, protection coordination, and equipment-operation questions can overlap without having the same technical answer. CNBYG can discuss AHF\/APF product-line context when measured harmonic current is the defined objective. It cannot establish tenant SLA compliance, shared-bus capacity verdicts, or a guaranteed harmonic result from an article or a nameplate rating. For wider navigation, use the <a href=\"https:\/\/cnbygele.com\/de\/power-quality-system-guides\/\">Leitf\u00e4den f\u00fcr die Systemtechnik der Netzqualit\u00e4t<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"define-the-electrical-boundary-before-collecting-data\">Definieren Sie die elektrische Grenze vor der Datenerfassung<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Die erste Entscheidung betrifft den Ort, an dem das Ergebnis verwendet wird. Eine Messung an einem einzelnen Abzweig kann helfen, eine lokale Last zu charakterisieren. Eine Messung an einem Hausanschluss, einer Transformatorsekund\u00e4rseite oder einem Verkn\u00fcpfungspunkt beantwortet eine andere Frage. Dokumentieren Sie den Z\u00e4hlerstandort, die CT-Ausrichtung, die Spannungsreferenz, das Abtastintervall, den Aggregationszeitraum, den Betriebszustand und ob andere gr\u00f6\u00dfere Lasten aktiv waren. Ohne diese Details kann ein Wert nicht zuverl\u00e4ssig mit einem Projektziel verglichen werden.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For shared colocation buses, create an operating log that identifies tenant move-in ramps, aggregate peak windows, maintenance transfers, and generator test periods. The log should make clear when the monitored load is active and what else is connected to the same bus. Where tenant equipment cannot be metered directly, record occupancy and known load events so bus-level changes can still be interpreted.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Ein n\u00fctzliches Aufma\u00dfprotokoll vor der Angebotsanfrage umfasst normalerweise folgende Punkte:<\/p>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">Die einpolige Darstellung der Position jedes Z\u00e4hlers unter Angabe des Wandlerverh\u00e4ltnisses und der Polung.<\/li>\n<li style=\"margin:0 0 8px\">Spannungs- und Stromspektren, die in definierten Aggregationszeitintervallen erfasst wurden, keine einzelnen Momentaufnahmen.<\/li>\n<li style=\"margin:0 0 8px\">A time-stamped operating log linking each measurement window to the tenant and bus operating state.<\/li>\n<li style=\"margin:0 0 8px\">Vorhandener Kondensator-, Drossel-, Filter- und Umrichterbestand am selben Strang.<\/li>\n<li style=\"margin:0 0 8px\">Der Leistungs- und Blindleistungsverlauf \u00fcber mindestens einen repr\u00e4sentativen Betriebszyklus.<\/li>\n<\/ul>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Messfrage<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">N\u00fctzlicher Projekteingang<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Entscheidung, die sie unterst\u00fctzt<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">What is occurring at the monitored tenant feeder?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Aktuelles Spektrum, RMS-Trend, Lastzustand, Stromwandler-Position<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Lokale Fehlersuche und Quellcharakterisierung<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Was geschieht an der Systemgrenze?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Spannungs- und Stromtrends, Lastbedarf, Transformator- und vorgelagerte Daten<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Systemweite Bewertung und Zieldefinition<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Is the condition repeatable across tenant peak windows?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Zeitlich abgestimmtes Betriebsprotokoll und mehrere repr\u00e4sentative Zeitr\u00e4ume<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Kapazit\u00e4ts- und Inbetriebnahmeministerium<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Welche Ger\u00e4te sind bereits angeschlossen?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Einliniendiagramm, Kondensator-\/Drossel-\/Filter- und Schutzdetails<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pr\u00fcfung von Interaktion und Integration<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"separate-harmonic-planning-from-other-electrical-questions\">Oberschwingungsplanung von anderen elektrischen Fragen trennen<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Die harmonische Planung sollte nicht zu einer pauschalen Erkl\u00e4rung f\u00fcr jedes betriebliche Problem werden. Ein Oberschwingungswert kann gleichzeitig mit Spannungsschwankungen, Blindleistungsbedarf, Unsymmetrie, Schaltvorg\u00e4ngen oder einer vorgelagerten St\u00f6rung auftreten. Jedes Problem ben\u00f6tigt einen eigenen Nachweis und eine eigene Abnahmemethode. Eine Empfehlung, die vor dieser Trennung ausgesprochen wird, kann zu einem falschen Projektumfang f\u00fchren, insbesondere wenn die Anlage bereits \u00fcber Kompensationseinrichtungen oder mehrere Quellen f\u00fcr nichtlineare Str\u00f6me verf\u00fcgt.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Das <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">\u00dcberblick \u00fcber den Standard IEEE 519<\/a> ist n\u00fctzlicher Kontext f\u00fcr die Diskussion der Oberschwingungsregelung an Systemgrenzen, aber keine universelle Faustregel f\u00fcr die Dimensionierung von Filtern. Projektteams m\u00fcssen den anwendbaren Punkt, den Datensatz, die Netzbedingungen und die vertraglichen Anforderungen festlegen. Ebenso kann ein Artikel nicht best\u00e4tigen, dass der gemessene Zustand ein bestimmtes Betriebsereignis verursacht. Nutzen Sie Messungen vor Ort und den verantwortlichen Ingenieurprozess, um diesen Zusammenhang herzustellen.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"compare-mitigation-paths-without-defaulting-to-one-device\">Vergleichen Sie die Minderungswege, ohne sich auf ein bestimmtes Ger\u00e4t festzulegen<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Der Minderungspfad folgt dem definierten Ziel. Eine Option sollte nur dann in die engere Auswahl kommen, wenn der Messdatensatz dies unterst\u00fctzt und das Integrationsdesign verstanden ist. Kein einzelnes Ger\u00e4t ist automatisch die richtige Antwort f\u00fcr jeden Oberschwingungswert, jedes Blindleistungsziel, jedes Spannungsereignis oder jedes Ergebnis einer Systemstudie. Bestehende Kondensatorb\u00e4nke, Drosseln, Filter, Antriebe, die Transformatorimpedanz, der Schutz und die erwartete Lastvariation beeinflussen alle die Projektpr\u00fcfung.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Optionskategorie<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Kann ber\u00fccksichtigt werden, wenn<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Muss vor der Auswahl best\u00e4tigt werden<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">AHF \/ APF<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Harmonic-current mitigation at the shared bus is a defined, measured objective<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Aktuelles Profil, Installationsort, CT-Plan, Kapazit\u00e4tsbasis, Schutz, W\u00e4rme und Abnahmemethode<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">SVG \/ ASVG<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Das dynamische Blindstromverhalten ist das prim\u00e4r definierte Ziel<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Blindleistungsprofil, Spannungskontext, vorhandene Ausr\u00fcstung, Regelungen und Inbetriebnahmegrenze<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Passive Bauteile<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Die Systemstudie identifiziert eine geeignete feste oder abgestimmte Funktion<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Resonanzrisiko, Schalten, Netzdaten, Schutz und physische Installation<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Operative oder vorgelagerte \u00c4nderung<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Die Herkunfts-, Zeitplan- oder Vertriebskonfiguration ist von wesentlicher Bedeutung<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Verantwortlichkeiten des Eigent\u00fcmers, Koordination der Versorgungsbetriebe und dokumentierter Umsetzungspfad<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">F\u00fcr eine Diskussion \u00fcber die Produktlinie siehe die <a href=\"https:\/\/cnbygele.com\/de\/product\/ahf-active-harmonic-filter-harmonic-control\/\">CNBYG AHF Aktiver Oberwellenfilter Seite<\/a>. Es sollte mit den Projektdaten verwendet werden, nicht als Ersatz f\u00fcr die Studie. Der entsprechende Leitfaden zu <a href=\"https:\/\/cnbygele.com\/de\/blog\/data-center-neutral-harmonics-apf-selection\/\">data center neutral harmonics and 3P4W APF selection<\/a> erkl\u00e4rt denselben messbasierten Ansatz in einem benachbarten Anwendungskontext.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"plan-integration-and-commissioning-early\">Integration und Inbetriebnahme fr\u00fchzeitig planen<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Integrationsfragen sollten vor der Herausgabe einer Angebotsanfrage (RFQ) identifiziert werden. Das Team sollte den vorgeschlagenen Anschlusspunkt, die WAND-Anordnung, die Einspeise- und Sammelschienenkonfiguration, den verf\u00fcgbaren Platz, die Kabelf\u00fchrung, die Bel\u00fcftung, die Umgebungsbedingungen, den Zugang, die Kommunikation, die Alarme und die Wartungsanforderungen dokumentieren. Auch der Schutzkoordination und den Abschaltanforderungen muss eine projektspezifische Pr\u00fcfung unterzogen werden. Dies sind Planungsvorgaben und keine Details, die aufgeschoben werden k\u00f6nnen, bis die Ausr\u00fcstung eintrifft.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Die Inbetriebnahme sollte repr\u00e4sentative Nachinstallationsbedingungen mit der im Voraus vereinbarten Baseline und der definierten Abnahmemethode vergleichen. Halten Sie die Betriebsbedingungen vergleichbar: Protokollieren Sie, welche Hauptlasten in Betrieb waren, wo die Messger\u00e4te angeschlossen waren und welche Messeinstellungen verwendet wurden. Wenn das Ziel der Anlage eine Systemgrenzen-Metrik umfasst, muss der Messplan diese Grenze beibehalten. Eine andere Messger\u00e4teposition oder ein anderer Lastzustand kann ein anderes Ergebnis liefern, ohne eine \u00c4nderung der Anlagenleistung zu zeigen. Der Leitfaden zu <a href=\"https:\/\/cnbygele.com\/de\/blog\/power-quality-system-planning-for-commercial-buildings\/\">Netzqualit\u00e4t-Planung f\u00fcr Gewerbeimmobilien<\/a> zeigt, wie dieselbe Inbetriebnahmedisziplin in einem \u00e4hnlichen Szenario anwendbar ist.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"rfq-checklist-and-fit-boundary\">RFQ-Checkliste und Passgrenze<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">An inquiry is more useful when it contains the single-line diagram, nominal voltage and frequency, transformer information, representative voltage\/current data, operating schedule, load inventory, existing capacitors\/reactors\/filters, protection information,proposed installation point, space and cooling data, and communication requirements. Describe the decision required: local troubleshooting, system-boundary assessment, harmonic-current mitigation, reactive-power response, or a coordinated review.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can review these inputs and discuss whether its product line fits the stated scope. It should not be asked to promise tenant SLA compliance, shared-bus capacity verdicts, or a guaranteed harmonic result. Where a project has regulated, critical, or unusual operating constraints, involve the relevant owner, system engineer, utility, and equipment specialists. Use the <a href=\"https:\/\/cnbygele.com\/de\/contact-us\/\">CNBYG-Kontaktseite<\/a> die verf\u00fcgbaren Projektinformationen einzureichen.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">H\u00e4ufig gestellte Fragen<\/h2>\n<h3 style=\"margin:28px 0 12px\">Who should own power quality measurements in a colocation facility?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">The operator and affected tenants should agree on measurement ownership, meter positions, and data sharing before mitigation is discussed, because the shared bus crosses contractual boundaries.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can one tenant&#8217;s mitigation equipment fix a shared-bus issue?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Not reliably. Equipment scoped to one tenant addresses that tenant&#8217;s defined objective; shared-bus results depend on all connected loads and the system design.<\/p>\n<h3 style=\"margin:28px 0 12px\">What data supports a shared-bus mitigation RFQ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Bus-level and tenant-feeder measurements, an occupancy and load-growth outline, existing equipment inventory, and the agreed acceptance boundary.<\/p>\n<h3 style=\"margin:28px 0 12px\">Ist eine Messung ausreichend, um Sanierungsger\u00e4te auszuw\u00e4hlen?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Normalerweise nicht. Der Messort, die Betriebsbedingungen, die Dauer, die elektrische Topologie und das Projektziel bestimmen, ob die Daten repr\u00e4sentativ sind.<\/p>\n<h3 style=\"margin:28px 0 12px\">Kann Schutzausr\u00fcstung allein anhand der angeschlossenen Last dimensioniert werden?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Nein. Eine Kapazit\u00e4tsdiskussion erfordert gemessenes Stromverhalten, ein Betriebsprofil, die Installationstopologie und ein definiertes Projektziel.<\/p>\n<h3 style=\"margin:28px 0 12px\">Garantiert dieser Artikel ein Compliance- oder Betriebsergebnis?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Nein. Die Anwendung von Standards, Netzwerkbedingungen, Abnahmekriterien und die Inbetriebnahme m\u00fcssen f\u00fcr das jeweilige Projekt definiert und verifiziert werden.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">Literaturverzeichnis<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 Empfohlene Richtlinie und Anforderungen f\u00fcr die Oberschwingungsbegrenzung in elektrischen Energiesystemen<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\/view\/motors-and-generators\" rel=\"nofollow noopener\" target=\"_blank\">NEMA MG 1 \u2014 Motoren und Generatoren<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.energy.gov\/eere\/amo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">US-Energieministerium \u2013 Abteilung f\u00fcr industrielle Effizienz und Dekarbonisierung<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>In a colocation data center, tenants share medium- and low-voltage buses, so one tenant&#x27;s rectifier load can shape the power quality another tenant sees. Planning shared-bus mitigation starts with defining the bus boundary, metering tenant feeders and the PCC separately, and agreeing who owns which measurement before any APF or SVG discussion begins. Contents Define [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2571","post","type-post","status-publish","format-standard","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/posts\/2571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/comments?post=2571"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/posts\/2571\/revisions"}],"predecessor-version":[{"id":2596,"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/posts\/2571\/revisions\/2596"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/media?parent=2571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/categories?post=2571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/de\/wp-json\/wp\/v2\/tags?post=2571"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}