{"id":2583,"date":"2026-08-01T15:00:00","date_gmt":"2026-08-01T07:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2583"},"modified":"2026-08-24T18:08:44","modified_gmt":"2026-08-24T10:08:44","slug":"parallel-apf-load-sharing-ct-commissioning","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/es\/blog\/parallel-apf-load-sharing-ct-commissioning\/","title":{"rendered":"Commissioning Multiple APFs for Parallel Load Sharing"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Parallel APF commissioning is a coordinated acceptance activity.<\/strong> Each unit needs a valid current reference, compatible operating settings, and staged observations at the common bus before any sharing behavior is treated as representative. For multiple APF units connected to a common bus or coordinated feeder group, the useful first step is to define the connection point, the operating states that matter, and the decision that will be made from the record. A local feeder result can characterize a source, while a bus or PCC result supports a different system-level discussion. Those results should not be substituted for one another.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">Respuesta directa<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Parallel APF commissioning is a coordinated acceptance activity. Each unit needs a valid current reference, compatible operating settings, and staged observations at the common bus before any sharing behavior is treated as representative. For multiple APF units connected to a common bus or coordinated feeder group, the useful first step is to define the connection point, the operating states that matter, and the decision that will be made from the record. A local feeder result can characterize a source, while a bus or PCC result supports a different system-level discussion. Those results should not be substituted for one another.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can discuss its product-line context only after the objective is clear. This page does not promise New long-tail topic: it is limited to multi-unit commissioning evidence, not general APF sizing, a controls-design specification, or a guaranteed sharing result.. For a broader framework, visit <a href=\"https:\/\/cnbygele.com\/es\/power-quality-system-guides\/\">Gu\u00edas del sistema de calidad de energ\u00eda CNBYG<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/what-is-a-static-var-compensator-cover-1.webp\" alt=\"parallel apf load sharing commissioning electrical assessment context\" \/><figcaption>Defina el l\u00edmite el\u00e9ctrico y el contexto operativo antes de tomar una decisi\u00f3n de selecci\u00f3n o puesta en marcha.<\/figcaption><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Contenido<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-define-the-decision-and-electrical-boundary\">Parte 1. Definir la decisi\u00f3n y el l\u00edmite el\u00e9ctrico<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-capture-representative-operating-states\">Parte 2. Capturar estados operativos representativos<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-keep-harmonic-reactive-and-operating-questions-separate\">Parte 3. Mantenga las preguntas arm\u00f3nicas, reactivas y operativas separadas<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-product-recommendation-with-a-fit-boundary\">Parte 4. Recomendaci\u00f3n de producto con un l\u00edmite de ajuste<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-plan-integration-and-staged-verification\">Parte 5. Integraci\u00f3n del plan y verificaci\u00f3n por etapas<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-rfq-checklist-and-fit-boundary\">Parte 6. Lista de verificaci\u00f3n de RFQ y l\u00edmite de ajuste<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-define-the-decision-and-electrical-boundary\">Parte 1. Definir la decisi\u00f3n y el l\u00edmite el\u00e9ctrico<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Un equipo de proyecto debe indicar si est\u00e1 investigando la observaci\u00f3n de un alimentador, documentando una condici\u00f3n de bus compartido, revisando el comportamiento de la potencia reactiva, planificando el cambio de un condensador o poniendo en marcha m\u00faltiples unidades. El objetivo nombrado determina la ubicaci\u00f3n del medidor y la evidencia que se puede comparar. Tambi\u00e9n evita que una lectura sea tratada como una conclusi\u00f3n sobre equipos no relacionados.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Record the meter position on the single-line diagram, voltage reference, CT ratio and polarity, aggregation method, and all major equipment active during the interval. Include CT locations and polarity, unit ratings, firmware and communications settings, feeder topology, staged load records, and acceptance method. The site record should name the bus, feeder, transformer secondary, or point of common coupling in plain language so that suppliers and owners interpret the data consistently.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Pregunta de decisi\u00f3n<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Evidencia a conservar<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">L\u00edmite que soporta<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 est\u00e1 ocurriendo en una fuente local?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Espectro actual, tendencia RMS, estado de carga, disposici\u00f3n de TC<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Caracterizaci\u00f3n de alimentadores<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 est\u00e1 ocurriendo en el bus com\u00fan?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tendencia de voltaje\/corriente, demanda, contexto de fuente y transformador<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Evaluaci\u00f3n de autob\u00fas o PCC<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfEs repetible una condici\u00f3n observada?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Eventos con marca de tiempo en estados operativos representativos<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Solicitud de cotizaci\u00f3n y planificaci\u00f3n de la puesta en marcha<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 est\u00e1 ya conectado?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Inventario de condensadores, reactores, filtros, variadores y protecciones<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Revisi\u00f3n de interacci\u00f3n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-capture-representative-operating-states\">Parte 2. Capturar estados operativos representativos<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The measurement window should reflect the way the system actually runs. For this topic, document multiple APF units connected to a common bus or coordinated feeder group during normal operation, transition events, planned switching states, and any coincident nonlinear loads that share the assessed bus. A single quiet period cannot show how a proposed change will interact with the electrical system under a different source or load condition.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Utilice un registro de operaciones con marca de tiempo junto con las mediciones el\u00e9ctricas. Anote la configuraci\u00f3n de la fuente, el estado de la etapa de condensadores, los arranques de cargas importantes, las alarmas y cualquier bypass de mantenimiento. Este registro disciplinado permite distinguir un patr\u00f3n repetible de un evento breve sin afirmar que un dispositivo caus\u00f3 cada s\u00edntoma visible.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The team can then establish a staged commissioning sequence before treating multi-unit behavior as an accepted result. If the available record does not include representative conditions, state that limitation in the RFQ rather than filling the gap with a nameplate assumption.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-keep-harmonic-reactive-and-operating-questions-separate\">Parte 3. Mantenga las preguntas arm\u00f3nicas, reactivas y operativas separadas<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Los debates sobre la calidad de la energ\u00eda suelen combinar la corriente arm\u00f3nica, la demanda de potencia reactiva, la variaci\u00f3n de tensi\u00f3n, el comportamiento de conmutaci\u00f3n y los problemas de protecci\u00f3n. Est\u00e1n relacionados a trav\u00e9s de la red, pero no son objetivos intercambiables. A un proveedor no se le debe pedir que infiera la soluci\u00f3n completa de un proyecto a partir de una lectura porcentual o del total de una carga conectada.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">El <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">Descripci\u00f3n general de la norma IEEE 519<\/a> proporciona contexto de autoridad para el control arm\u00f3nico, pero no reemplaza la decisi\u00f3n del proyecto sobre el punto de evaluaci\u00f3n aplicable, el conjunto de datos, las condiciones de red o los criterios contractuales. El <a href=\"https:\/\/www.nema.org\/standards\" rel=\"nofollow noopener\" target=\"_blank\">Recurso de normas NEMA<\/a> es igualmente \u00fatil para el contexto general del equipo, no para garantizar el resultado de un sitio.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/what-is-a-static-var-compensator-body-1.webp\" alt=\"parallel apf load sharing commissioning measurement and integration review\" \/><figcaption>Las mediciones, la topolog\u00eda y los registros de operaci\u00f3n deben revisarse conjuntamente antes de cambiar los equipos.<\/figcaption><\/figure>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Condici\u00f3n en evaluaci\u00f3n<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Noasumas<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Pregunta del proyecto a resolver<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Indicaci\u00f3n de corriente arm\u00f3nica<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Que define la necesidad de potencia reactiva<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 espectro y qu\u00e9 l\u00edmite son relevantes?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Variaci\u00f3n del factor de potencia<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Que identifica distorsi\u00f3n o resonancia<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 comportamiento fundamental de kVAR est\u00e1 presente?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Evento de conmutaci\u00f3n de condensadores<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Que una configuraci\u00f3n de reactor est\u00e1ndar es adecuada<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 escenarios y entradas de red se evaluaron?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Respuesta de m\u00faltiples unidades<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Que las referencias de configuraci\u00f3n o de CT son correctas<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00bfQu\u00e9 evidencia organizada apoya la aceptaci\u00f3n?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-product-recommendation-with-a-fit-boundary\">Parte 4. Recomendaci\u00f3n de producto con un l\u00edmite de ajuste<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Para un objetivo de proyecto definido, revise el <a href=\"https:\/\/cnbygele.com\/es\/product\/ahf-active-harmonic-filter-harmonic-control\/\">Filtro Arm\u00f3nico Activo CNBYG AHF<\/a> p\u00e1gina de producto junto con el registro el\u00e9ctrico real. La p\u00e1gina es un punto de partida para la discusi\u00f3n de la l\u00ednea de productos, no un sustituto de la selecci\u00f3n de capacidad, la coordinaci\u00f3n de protecciones o un estudio de red. Una adecuaci\u00f3n correcta depende del punto de conexi\u00f3n propuesto, la configuraci\u00f3n del sistema, la evidencia de medici\u00f3n, los controles, el entorno t\u00e9rmico y el m\u00e9todo de aceptaci\u00f3n acordado.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Product recommendation: consider AHF Active Harmonic Filter only where its intended role matches a measured and documented objective. Do not recommend it when the main issue is unverified, solely upstream, outside the confirmed scope, or requires a different engineering control. This fit boundary is essential when existing capacitor banks, reactors, or multiple nonlinear sources are present.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">La lectura relacionada puede ayudar al propietario a formular preguntas adyacentes: <a href=\"https:\/\/cnbygele.com\/es\/blog\/vfd-harmonics-industrial-plants-apf-selection\/\">la primera gu\u00eda relacionada de CNBYG<\/a> y <a href=\"https:\/\/cnbygele.com\/es\/blog\/power-quality-metering-before-apf-svg-rfq\/\">la segunda gu\u00eda relacionada de CNBYG<\/a>. Ninguno reemplaza la evidencia del autob\u00fas o alimentador actual.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-plan-integration-and-staged-verification\">Parte 5. Integraci\u00f3n del plan y verificaci\u00f3n por etapas<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Los detalles de integraci\u00f3n deben constar en la definici\u00f3n del proyecto antes de realizar un pedido. Documente el espacio disponible, la disposici\u00f3n de las conexiones, la topolog\u00eda de alimentadores y barras, la disposici\u00f3n de los transformadores de corriente o de referencia, el tendido de cables, la ventilaci\u00f3n, el acceso, las comunicaciones, las alarmas, las restricciones de apagado y las responsabilidades de protecci\u00f3n. Esos datos dan forma tanto a una instalaci\u00f3n pr\u00e1ctica como a un plan de puesta en marcha transparente.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">La verificaci\u00f3n por etapas debe preservar condiciones comparables. Registre la ubicaci\u00f3n del medidor, el estado operativo, el estado de la unidad y la configuraci\u00f3n para cada paso. Compare los resultados \u00fanicamente con el l\u00edmite y el m\u00e9todo de aceptaci\u00f3n acordados previamente; mover un medidor o cambiar la combinaci\u00f3n de carga puede alterar el resultado sin probar un efecto en el equipo.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Para un contexto de sistemas industriales, los lectores tambi\u00e9n pueden consultar el <a href=\"https:\/\/www.energy.gov\/eere\/iedo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">Oficina de Eficiencia Industrial y Descarbonizaci\u00f3n del Departamento de Energ\u00eda de EE. UU.<\/a>. Sus recursos no certifican una instalaci\u00f3n en particular ni establecen el cumplimiento del proyecto.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-rfq-checklist-and-fit-boundary\">Parte 6. Lista de verificaci\u00f3n de RFQ y l\u00edmite de ajuste<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Una solicitud de cotizaci\u00f3n (RFQ) debe incluir un diagrama unifilar actualizado, tensi\u00f3n y frecuencia nominales, datos de la fuente y del transformador, archivos de medidores con detalles de los transformadores de corriente (CT), programa de operaci\u00f3n, inventario de cargas, detalles de capacitores\/reactores\/filtros existentes, informaci\u00f3n de protecci\u00f3n, ubicaci\u00f3n de instalaci\u00f3n propuesta, informaci\u00f3n de espacio y refrigeraci\u00f3n, requisitos de comunicaci\u00f3n y el m\u00e9todo de aceptaci\u00f3n. Identifique si la decisi\u00f3n es una tarea de soluci\u00f3n de problemas local, una revisi\u00f3n de bus com\u00fan, control de potencia reactiva, mitigaci\u00f3n de corriente arm\u00f3nica o puesta en marcha coordinada.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG puede revisar la informaci\u00f3n proporcionada a trav\u00e9s de su <a href=\"https:\/\/cnbygele.com\/es\/contact-us\/\">p\u00e1gina de contacto<\/a> and discuss whether the product line fits the documented scope. It cannot convert this article into a guarantee of New long-tail topic: it is limited to multi-unit commissioning evidence, not general APF sizing, a controls-design specification, or a guaranteed sharing result.. Where utility coordination, safety, code, critical-load, or unusual operating requirements apply, involve the owner and qualified responsible engineering parties.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/what-is-a-static-var-compensator-product.webp\" alt=\"parallel apf load sharing commissioning product recommendation and RFQ context\" \/><figcaption>Utilice un alcance documentado y un registro de solicitud de cotizaci\u00f3n (RFQ) antes de solicitar una recomendaci\u00f3n de producto.<\/figcaption><\/figure>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">Preguntas frecuentes<\/h2>\n<h3 style=\"margin:28px 0 12px\">Why does CT polarity matter in parallel APF commissioning?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">The current reference informs each unit&#8217;s control response. A reversed or misplaced reference can invalidate staged observations and must be corrected through the installation review.<\/p>\n<h3 style=\"margin:28px 0 12px\">Should all APFs be energized at once?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">A staged sequence is usually easier to interpret: verify the common reference and each unit first, then add units while recording the same representative operating condition.<\/p>\n<h3 style=\"margin:28px 0 12px\">Do communication settings replace CT checks?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. Communications settings and CT reference integrity are separate commissioning inputs, both of which require project-specific verification.<\/p>\n<h3 style=\"margin:28px 0 12px\">\u00bfPuede una sola instant\u00e1nea determinar el equipo de mitigaci\u00f3n?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. La ubicaci\u00f3n del medidor, el estado de operaci\u00f3n, la ventana de tiempo, la topolog\u00eda del sistema y el objetivo definido determinan si el registro es representativo.<\/p>\n<h3 style=\"margin:28px 0 12px\">\u00bfEsta gu\u00eda garantiza un resultado normativo u operativo?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. Los requisitos aplicables, las condiciones de red, los criterios de aceptaci\u00f3n y la puesta en marcha pertenecen al proceso del proyecto responsable.<\/p>\n<h3 style=\"margin:28px 0 12px\">\u00bfQu\u00e9 debe incluirse en una solicitud de cotizaci\u00f3n (RFQ)?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Proporcione un diagrama unifilar, datos el\u00e9ctricos nominales, mediciones representativas, horario de operaci\u00f3n, equipo instalado y restricciones de instalaci\u00f3n.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">Referencias<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 Control de arm\u00f3nicos en sistemas de energ\u00eda el\u00e9ctrica<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\" rel=\"nofollow noopener\" target=\"_blank\">Normas y publicaciones de NEMA<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.energy.gov\/eere\/iedo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">Departamento de Energ\u00eda de los Estados Unidos \u2014 Oficina de Eficiencia Industrial y Descarbonizaci\u00f3n<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Parallel APF commissioning is a coordinated acceptance activity. Each unit needs a valid current reference, compatible operating settings, and staged observations at the common bus before any sharing behavior is treated as representative. For multiple APF units connected to a common bus or coordinated feeder group, the useful first step is to define the connection [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2583","post","type-post","status-publish","format-standard","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/posts\/2583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/comments?post=2583"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/posts\/2583\/revisions"}],"predecessor-version":[{"id":2586,"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/posts\/2583\/revisions\/2586"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/media?parent=2583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/categories?post=2583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/es\/wp-json\/wp\/v2\/tags?post=2583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}