{"id":2226,"date":"2026-07-23T15:00:00","date_gmt":"2026-07-23T07:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2226"},"modified":"2026-07-29T00:12:42","modified_gmt":"2026-07-28T16:12:42","slug":"hybrid-apf-capacitor-reactive-power-coordination","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/fr\/blog\/hybrid-apf-capacitor-reactive-power-coordination\/","title":{"rendered":"Coordination Hybride APF et Condensateur pour la Puissance R\u00e9active"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Coordination of capacitor stages and active harmonic filtering in hybrid compensation should begin with a documented electrical boundary, representative operating record, and a defined decision.<\/strong> Une lecture de compteur, une plaque signal\u00e9tique de composant ou un seul \u00e9v\u00e9nement de commutation n'\u00e9tablissent pas \u00e0 eux seuls la cause, l'\u00e9quipement requis ou les crit\u00e8res d'acceptation.<\/p>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Contenu<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-start-with-the-decision-question\">Premi\u00e8re partie. Commencez par la question de d\u00e9cision<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-set-the-electrical-and-operating-boundary\">Partie 2. D\u00e9finir la limite \u00e9lectrique et op\u00e9rationnelle<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-build-a-defensible-measurement-record\">Partie 3. Construire un historique de mesures d\u00e9fendable<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-compare-scenarios-before-interpreting-results\">Partie 4. Comparer les sc\u00e9narios avant d'interpr\u00e9ter les r\u00e9sultats<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-evaluate-integration-paths-and-rfq-inputs\">Partie 5. \u00c9valuer les chemins d'int\u00e9gration et les entr\u00e9es RFQ<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-apply-the-fit-boundary\">Partie 6. Appliquer la limite d'ajustement<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">R\u00e9ponse directe<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Coordination of capacitor stages and active harmonic filtering in hybrid compensation should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate, or a single switching event does not by itself establish the cause, the required equipment, or the acceptance criteria.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can discuss AHF Active Harmonic Filter product-line context when the recorded evidence supports a defined objective. It cannot establish This is a coordination and study-input article, not a generic APF-versus-SVG comparison or a claim that capacitors are safe for every harmonic network. from an article. For broader navigation, see <a href=\"https:\/\/cnbygele.com\/fr\/power-quality-system-guides\/\">Guides sur la qualit\u00e9 de l'alimentation \u00e9lectrique<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-start-with-the-decision-question\">Premi\u00e8re partie. Commencez par la question de d\u00e9cision<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">A capacitor stage can reduce steady reactive demand while changing the impedance landscape seen by harmonic current. Hybrid planning must compare each switching state instead of treating the bank as electrically invisible once it is energized. The practical question is not whether one waveform is \u201cgood\u201d or \u201cbad.\u201d It is whether the evidence describes the same electrical point and operating condition that the project team will use for a decision.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Commencez par noter le sympt\u00f4me, la d\u00e9cision pr\u00e9vue et la limite d'acceptation. La capture d'un chargeur peut \u00eatre la bonne fa\u00e7on de caract\u00e9riser une source. Une capture sur un bus commun, un secondaire de transformateur ou un PCC r\u00e9pond \u00e0 une question diff\u00e9rente. La combinaison des deux sans \u00e9tiquettes peut transformer une investigation utile en une demande d'\u00e9quipement trompeuse.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/static-var-compensator-manufacturer-selection-guide-cover-2.webp\" alt=\"hybrid capacitor and APF compensation measurement context on an industrial power system\" \/><\/figure>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-set-the-electrical-and-operating-boundary\">Partie 2. D\u00e9finir la limite \u00e9lectrique et op\u00e9rationnelle<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">For industrial buses with variable reactive demand, nonlinear current, and existing capacitor stages, the measurement plan should name the meter position, voltage reference, CT ratio and polarity, aggregation interval, and the upstream topology in effect. Collect a current spectrum and voltage trend where the load is observed, then add a bus-level location if the decision concerns a shared system boundary.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The operations log is equally important. Capture minimum-load periods, process ramps, capacitor-stage switching, peak production, and maintenance bypass states. Mark events with a common clock so the electrical record can be compared with the process record. A high reading during a brief transition is not automatically representative of normal operation, and a calm period can omit the condition that created the original concern.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Emplacement de mesure<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Preuve recueillie<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Question support\u00e9e<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">alimentateur individuel<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Forme d'onde actuelle, tendance RMS, \u00e9tat de charge, d\u00e9tails du TC<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Quel groupe local contribue sous un \u00c9tat connu ?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bus commun ou PCC<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tendance tension\/courant, demande, informations sur la source<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Qu'appara\u00eet-il \u00e0 la fronti\u00e8re du syst\u00e8me d\u00e9finie ?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Connexion de r\u00e9mun\u00e9ration existante<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Changement d'\u00e9tat, spectre, protection et contr\u00f4les<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Le mat\u00e9riel connect\u00e9 pourrait-il affecter la condition observ\u00e9e ?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Enregistrement de processus ou de contr\u00f4leur<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00c9v\u00e9nements d'exploitation horodat\u00e9s<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Le changement \u00e9lectrique correspond-il \u00e0 une transition op\u00e9rationnelle r\u00e9elle ?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-build-a-defensible-measurement-record\">Partie 3. Construire un historique de mesures d\u00e9fendable<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">L'enregistrement doit avoir une dur\u00e9e suffisante pour inclure des mod\u00e8les de production r\u00e9p\u00e9tables et une r\u00e9solution d'\u00e9v\u00e9nements suffisante pour pr\u00e9server le comportement qui compte. Pr\u00e9server les exportations de compteurs d'origine ainsi que les graphiques r\u00e9capitulatifs. Noter la configuration de l'instrument, l'orientation du CT, les fils de tension, la source d'horloge et toute modification de configuration pendant la campagne.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">La <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">Aper\u00e7u de la norme IEEE 519<\/a> fournit un contexte utile pour le contr\u00f4le harmonique mais ne s\u00e9lectionne pas un appareil \u00e0 partir d'un seul num\u00e9ro. Lorsque le scintillement est \u00e0 l'examen, le <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/4185\" rel=\"nofollow noopener\" target=\"_blank\">Aper\u00e7u de la norme IEC 61000-4-15<\/a> fournit le contexte de la m\u00e9thode ; il n'\u00e9limine pas le besoin d'\u00e9tablir le point d'\u00e9valuation et les exigences du projet.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Ne transformez pas chaque sympt\u00f4me \u00e9lectrique en une conclusion harmonique. Les \u00e9v\u00e9nements de tension, le mouvement de puissance r\u00e9active, le d\u00e9s\u00e9quilibre, les transitoires de commutation, le comportement de protection et les changements c\u00f4t\u00e9 processus peuvent coexister. S\u00e9parez leurs flux de preuves avant de vous demander s'ils partagent une cause.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/static-var-compensator-manufacturer-selection-guide-body-2.webp\" alt=\"hybrid capacitor and APF compensation technical measurement and operating-state review\" \/><\/figure>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-compare-scenarios-before-interpreting-results\">Partie 4. Comparer les sc\u00e9narios avant d'interpr\u00e9ter les r\u00e9sultats<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Utilisez la comparaison de sc\u00e9narios pour \u00e9viter de masquer les conditions importantes par le calcul de la moyenne. Chaque ligne ci-dessous doit \u00eatre remplie \u00e0 partir d'un relev\u00e9 d'op\u00e9rations et d'un enregistrement de compteur align\u00e9s dans le temps ; il s'agit d'un cadre de planification plut\u00f4t que d'un seuil de performance pr\u00e9d\u00e9fini.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Sc\u00e9nario<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Enregistrer avant comparaison<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Limite d'interpr\u00e9tation<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Activit\u00e9 de base \/ minimale<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Disposition des sources, niveau de charge, spectre, tension, kvar<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00c9tablit une r\u00e9f\u00e9rence uniquement pour la topologie document\u00e9e<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Production typique<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Process state, coincident loads, kvar trend, displacement power factor, current spectrum, capacitor-stage status, and bus-voltage trend<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Montre la condition de fonctionnement r\u00e9p\u00e9table<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pic ou transition<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Horodatages d'\u00e9v\u00e9nements, s\u00e9quence de chargement, \u00e9tat de la source<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Teste si une pr\u00e9occupation est li\u00e9e \u00e0 une transition sp\u00e9cifique<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Commutation ou contournement de l'\u00e9quipement<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Position du commutateur, \u00e9tat de l'alarme, traces avant\/apr\u00e8s<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Identifie la corr\u00e9lation, pas la causalit\u00e9, jusqu'\u00e0 examen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">Comparez ce qui est comparable. Si la source en amont, le point de mesure, le chargement ou l'\u00e9tat de fonctionnement changent, indiquez ce changement \u00e0 c\u00f4t\u00e9 du r\u00e9sultat. Cette discipline est particuli\u00e8rement importante lorsque la condition mesur\u00e9e est intermittente : un graphique avant\/apr\u00e8s attrayant peut \u00eatre d\u00e9nu\u00e9 de sens si la s\u00e9quence de production \u00e9tait diff\u00e9rente.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-evaluate-integration-paths-and-rfq-inputs\">Partie 5. \u00c9valuer les chemins d'int\u00e9gration et les entr\u00e9es RFQ<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Les \u00e9quipements de mitigation suivent l'objectif d\u00e9fini et la conception de l'installation. Le <a href=\"https:\/\/cnbygele.com\/fr\/produit\/ahf-active-harmonic-filter-harmonic-control\/\">Filtre Harmonique Actif CNBYG AHF page<\/a> est un point de d\u00e9part de ligne de produit, pas un substitut \u00e0 des preuves syst\u00e8me. Une \u00e9quipe de projet peut en tenir compte lorsque l'objectif mesur\u00e9, l'emplacement de la connexion, la r\u00e9f\u00e9rence du TC, le profil de courant ou r\u00e9actif le cas \u00e9ch\u00e9ant, la base de capacit\u00e9, les conditions thermiques, la protection et les contr\u00f4les sont clairs.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Avant une Demande de Prix (RFQ), documentez la tension et la fr\u00e9quence nominales unipolaires, les informations sur la source et le transformateur, les relev\u00e9s de compteurs, le journal de production ou d'exploitation, les entra\u00eenements et redresseurs connect\u00e9s, les condensateurs\/bobines d'inductance\/filtres existants, l'emplacement propos\u00e9, la disposition des feeders, l'espace disponible, le refroidissement, les communications, les alarmes et les limites d'arr\u00eat. L'article connexe sur <a href=\"https:\/\/cnbygele.com\/fr\/blog\/preventing-capacitor-harmonic-resonance-in-industrial-systems\/\">pr\u00e9vention de la r\u00e9sonance harmonique des condensateurs<\/a> donne un contexte adjacent ; <a href=\"https:\/\/cnbygele.com\/fr\/blog\/anti-harmonic-intelligent-capacitors-vs-active-filtering\/\">intelligent capacitors versus active filtering<\/a> aborde une fronti\u00e8re de d\u00e9cision connexe.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/static-var-compensator-manufacturer-selection-guide-product-1.webp\" alt=\"CNBYG AHF Active Harmonic Filter product recommendation context for hybrid capacitor and APF compensation\" \/><\/figure>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-apply-the-fit-boundary\">Partie 6. Appliquer la limite d'ajustement<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">This is a coordination and study-input article, not a generic APF-versus-SVG comparison or a claim that capacitors are safe for every harmonic network. It also does not replace utility coordination, a protection study, equipment certification review, or project commissioning. Those responsibilities remain with the parties accountable for the installation and its acceptance criteria.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG peut examiner les entr\u00e9es de projet disponibles et discuter de l'ad\u00e9quation de sa gamme de produits au champ d'application d\u00e9fini. Si le relev\u00e9 de mesure est incomplet, pr\u00e9servez l'incertitude plut\u00f4t que de le compl\u00e9ter par une recommandation g\u00e9n\u00e9rique d'appareil. Utiliser <a href=\"https:\/\/cnbygele.com\/fr\/power-quality-system-guides\/\">Guides sur la qualit\u00e9 de l'alimentation \u00e9lectrique<\/a> pour une navigation plus large, ou <a href=\"https:\/\/cnbygele.com\/fr\/contact-us\/\">contacter CNBYG<\/a> avec les informations syst\u00e8me document\u00e9es.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">Foire aux questions<\/h2>\n<h3 style=\"margin:28px 0 12px\">Why record capacitor-stage status with harmonic data?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Capacitor stages alter the network impedance. A spectrum without the matching stage state cannot show whether a change is tied to switching, load variation, or another system event.<\/p>\n<h3 style=\"margin:28px 0 12px\">Does an APF make capacitor resonance checks unnecessary?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. The installed capacitor, reactor, transformer, cable, and source configuration still need project-specific study inputs and an agreed operating-state review.<\/p>\n<h3 style=\"margin:28px 0 12px\">When is hybrid compensation worth evaluating?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">It may be evaluated where measured reactive demand, nonlinear current, and existing stage behavior indicate separate but interacting objectives. The connection and control strategy require engineering review.<\/p>\n<h3 style=\"margin:28px 0 12px\">Quelles donn\u00e9es doivent \u00eatre incluses dans une demande de cotation (RFQ) ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Fournir le sch\u00e9ma unifilaire, les donn\u00e9es nominales du syst\u00e8me, les informations sur la source ou le transformateur, les exportations des compteurs repr\u00e9sentatifs, le journal d'exploitation, l'inventaire des \u00e9quipements existants, le point de connexion propos\u00e9, les contraintes de protection et les conditions d'installation.<\/p>\n<h3 style=\"margin:28px 0 12px\">Cet article garantit-il un r\u00e9sultat de conformit\u00e9 ou de fonctionnement ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Non. Les crit\u00e8res d'acceptation, les conditions du r\u00e9seau, l'int\u00e9gration de l'\u00e9quipement et la mise en service appartiennent au projet sp\u00e9cifique et doivent \u00eatre examin\u00e9s par l'\u00e9quipe d'ing\u00e9nierie responsable.<\/p>\n<h3 style=\"margin:28px 0 12px\">Qui devrait examiner les contraintes inhabituelles ou critiques du site ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Impliquer le propri\u00e9taire de l'actif, l'ing\u00e9nieur \u00e9lectricien qualifi\u00e9, le sp\u00e9cialiste des g\u00e9n\u00e9rateurs ou des proc\u00e9d\u00e9s, le cas \u00e9ch\u00e9ant, le fournisseur d'\u00e9nergie ou les parties prenantes en amont, ainsi que les parties responsables de la protection et de la mise en service.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">R\u00e9f\u00e9rences<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 Contr\u00f4le harmonique dans les syst\u00e8mes d'\u00e9nergie \u00e9lectrique<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/4185\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61000-4-15 \u2014 Sp\u00e9cifications fonctionnelles et de conception des appareils de mesure de flicker<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\/view\/motors-and-generators\" rel=\"nofollow noopener\" target=\"_blank\">NEMA MG 1 \u2014 Moteurs et G\u00e9n\u00e9rateurs<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Coordination of capacitor stages and active harmonic filtering in hybrid compensation should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate, or a single switching event does not by itself establish the cause, the required equipment, or the acceptance criteria. Contents Part 1. Start with [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1945,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2226","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts\/2226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/comments?post=2226"}],"version-history":[{"count":3,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts\/2226\/revisions"}],"predecessor-version":[{"id":2300,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts\/2226\/revisions\/2300"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/media\/1945"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/media?parent=2226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/categories?post=2226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/tags?post=2226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}