{"id":2578,"date":"2026-07-30T15:00:00","date_gmt":"2026-07-30T07:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2578"},"modified":"2026-08-24T18:08:57","modified_gmt":"2026-08-24T10:08:57","slug":"power-factor-versus-harmonic-distortion-selection","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/fr\/blog\/power-factor-versus-harmonic-distortion-selection\/","title":{"rendered":"S\u00e9parer les d\u00e9cisions sur le facteur de puissance et la distorsion harmonique"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>A low displacement power factor and a high harmonic-current level are separate observations.<\/strong> One describes the phase relationship of fundamental current and voltage; the other describes non-sinusoidal current components. A project can have either condition, both conditions, or neither. For industrial distribution systems showing both power-factor variation and nonlinear current, the useful first step is to define the connection point, the operating states that matter, and the decision that will be made from the record. A local feeder result can characterize a source, while a bus or PCC result supports a different system-level discussion. Those results should not be substituted for one another.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">R\u00e9ponse directe<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">A low displacement power factor and a high harmonic-current level are separate observations. One describes the phase relationship of fundamental current and voltage; the other describes non-sinusoidal current components. A project can have either condition, both conditions, or neither. For industrial distribution systems showing both power-factor variation and nonlinear current, the useful first step is to define the connection point, the operating states that matter, and the decision that will be made from the record. A local feeder result can characterize a source, while a bus or PCC result supports a different system-level discussion. Those results should not be substituted for one another.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can discuss its product-line context only after the objective is clear. This page does not promise This is an objective-separation article, not a generic APF\/SVG comparison, a device-sizing method, or a claim that one technology solves both measured conditions.. For a broader framework, visit <a href=\"https:\/\/cnbygele.com\/fr\/power-quality-system-guides\/\">Guides du syst\u00e8me de qualit\u00e9 d'alimentation CNBYG<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/static-var-compensator-manufacturer-selection-guide-cover-1.webp\" alt=\"power factor vs harmonic distortion electrical assessment context\" \/><figcaption>D\u00e9finissez la limite \u00e9lectrique et le contexte d'exploitation avant une d\u00e9cision de s\u00e9lection ou de mise en service.<\/figcaption><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Contenu<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-define-the-decision-and-electrical-boundary\">Partie 1. D\u00e9finir la d\u00e9cision et la limite \u00e9lectrique<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-capture-representative-operating-states\">Partie 2. Capturer les \u00e9tats de fonctionnement repr\u00e9sentatifs<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-keep-harmonic-reactive-and-operating-questions-separate\">Partie 3. Garder les questions harmoniques, r\u00e9actives et op\u00e9rationnelles s\u00e9par\u00e9es<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-product-recommendation-with-a-fit-boundary\">Partie 4. Recommandation de produit avec une limite d'ajustement<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-plan-integration-and-staged-verification\">Partie 5. Int\u00e9gration et v\u00e9rification par \u00e9tapes<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-rfq-checklist-and-fit-boundary\">Partie 6. Liste de contr\u00f4le RFQ et limites de conformit\u00e9<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-define-the-decision-and-electrical-boundary\">Partie 1. D\u00e9finir la d\u00e9cision et la limite \u00e9lectrique<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Une \u00e9quipe de projet doit indiquer si elle enqu\u00eate sur une observation de feeder, documente une condition de bus partag\u00e9, examine le comportement de la puissance r\u00e9active, planifie un changement de condensateur ou met en service plusieurs unit\u00e9s. L'objectif nomm\u00e9 d\u00e9termine l'emplacement du compteur et les preuves qui peuvent \u00eatre compar\u00e9es. Cela emp\u00eache \u00e9galement qu'une lecture soit trait\u00e9e comme une conclusion sur un \u00e9quipement non li\u00e9.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Record the meter position on the single-line diagram, voltage reference, CT ratio and polarity, aggregation method, and all major equipment active during the interval. Include reactive-power trend, fundamental kW\/kvar data, current spectrum, voltage trend, and capacitor-switching state. The site record should name the bus, feeder, transformer secondary, or point of common coupling in plain language so that suppliers and owners interpret the data consistently.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Question de d\u00e9cision<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Preuve \u00e0 conserver<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Fronti\u00e8re qu'il soutient<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Que se passe-t-il \u00e0 la source locale ?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Spectre actuel, tendance RMS, \u00e9tat de charge, configuration du transformateur de courant<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Caract\u00e9risation du chargeur<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Que se passe-t-il au bus commun ?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tendance tension\/courant, demande, source et contexte du transformateur<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00c9valuation de bus ou de PCC<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Une condition observ\u00e9e est-elle reproductible ?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u00c9v\u00e9nements horodat\u00e9s dans des \u00e9tats de fonctionnement repr\u00e9sentatifs<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Planification de la demande de prix et de la mise en service<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Qu'est-ce qui est d\u00e9j\u00e0 connect\u00e9 ?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Inventaire des condensateurs, r\u00e9actances, filtres, variateurs et protections<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Revue d'interaction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-capture-representative-operating-states\">Partie 2. Capturer les \u00e9tats de fonctionnement repr\u00e9sentatifs<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The measurement window should reflect the way the system actually runs. For this topic, document industrial distribution systems showing both power-factor variation and nonlinear current during normal operation, transition events, planned switching states, and any coincident nonlinear loads that share the assessed bus. A single quiet period cannot show how a proposed change will interact with the electrical system under a different source or load condition.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Utilisez un journal d'op\u00e9rations horodat\u00e9 parall\u00e8lement aux mesures \u00e9lectriques. Notez la configuration de la source, l'\u00e9tat de l'\u00e9tage du condensateur, les d\u00e9marrages de charges importantes, les alarmes et tout contournement de maintenance. Ce relev\u00e9 rigoureux permet de distinguer un sch\u00e9ma r\u00e9p\u00e9table d'un \u00e9v\u00e9nement bref sans affirmer qu'un appareil a caus\u00e9 tous les sympt\u00f4mes visibles.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The team can then separate the objective before choosing reactive compensation, harmonic mitigation, or a coordinated study. If the available record does not include representative conditions, state that limitation in the RFQ rather than filling the gap with a nameplate assumption.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-keep-harmonic-reactive-and-operating-questions-separate\">Partie 3. Garder les questions harmoniques, r\u00e9actives et op\u00e9rationnelles s\u00e9par\u00e9es<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Les discussions sur la qualit\u00e9 de l'\u00e9nergie combinent souvent le courant harmonique, la demande de puissance r\u00e9active, la variation de tension, le comportement de commutation et les probl\u00e8mes de protection. Ils sont li\u00e9s par le r\u00e9seau mais ne sont pas des objectifs interchangeables. On ne devrait pas demander \u00e0 un fournisseur de d\u00e9duire une solution compl\u00e8te de projet \u00e0 partir d'une seule lecture en pourcentage ou d'un total de charge connect\u00e9e.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">La <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">Aper\u00e7u de la norme IEEE 519<\/a> fournit un contexte d'autorit\u00e9 pour le contr\u00f4le harmonique, mais il ne remplace pas la d\u00e9cision du projet concernant le point d'\u00e9valuation applicable, l'ensemble de donn\u00e9es, les conditions du r\u00e9seau ou les crit\u00e8res contractuels. Le <a href=\"https:\/\/www.nema.org\/standards\" rel=\"nofollow noopener\" target=\"_blank\">Ressource des normes NEMA<\/a> est \u00e9galement utile dans un contexte d'\u00e9quipement g\u00e9n\u00e9ral, pas pour garantir un r\u00e9sultat de site.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/static-var-compensator-manufacturer-selection-guide-body-1.webp\" alt=\"power factor vs harmonic distortion measurement and integration review\" \/><figcaption>Les mesures, la topologie et les registres d'exploitation doivent \u00eatre examin\u00e9s ensemble avant de modifier l'\u00e9quipement.<\/figcaption><\/figure>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u00c9tat en cours d'examen<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Ne pr\u00e9sumez pas<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Question du projet \u00e0 r\u00e9soudre<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Indication de courant harmonique<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Qu'il d\u00e9finit le besoin en puissance r\u00e9active<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Quel spectre et quelle limite sont pertinents ?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Variation du facteur de puissance<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Qu'il identifie la distorsion ou la r\u00e9sonance<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Quel comportement fondamental de kvar est pr\u00e9sent ?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Commutation de condensateur<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Qu'un r\u00e9glage standard du r\u00e9acteur convient<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Quels sc\u00e9narios et quelles entr\u00e9es r\u00e9seau ont \u00e9t\u00e9 \u00e9valu\u00e9s ?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">R\u00e9ponse multi-unit\u00e9s<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Ces r\u00e9glages ou r\u00e9f\u00e9rences CT sont corrects<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Quelles preuves fabriqu\u00e9es soutiennent l'acceptation ?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-product-recommendation-with-a-fit-boundary\">Partie 4. Recommandation de produit avec une limite d'ajustement<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Pour un objectif de projet d\u00e9fini, examiner le <a href=\"https:\/\/cnbygele.com\/fr\/produit\/svg-static-var-generators\/\">G\u00e9n\u00e9rateurs de puissance r\u00e9active statique CNBYG SVG<\/a> page produit aux c\u00f4t\u00e9s de l'enregistrement \u00e9lectrique r\u00e9el. La page sert de point de d\u00e9part pour la discussion de la gamme de produits, et non de substitut \u00e0 la s\u00e9lection de capacit\u00e9, \u00e0 la coordination de protection ou \u00e0 une \u00e9tude de r\u00e9seau. Un bon ajustement d\u00e9pend du point de connexion propos\u00e9, de la configuration du syst\u00e8me, des preuves de mesure, des contr\u00f4les, de l'environnement thermique et de la m\u00e9thode d'acceptation convenue.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Product recommendation: consider SVG Static Var Generators only where its intended role matches a measured and documented objective. Do not recommend it when the main issue is unverified, solely upstream, outside the confirmed scope, or requires a different engineering control. This fit boundary is essential when existing capacitor banks, reactors, or multiple nonlinear sources are present.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">La lecture connexe peut aider le propri\u00e9taire \u00e0 formuler des questions adjacentes : <a href=\"https:\/\/cnbygele.com\/fr\/blog\/anti-harmonic-intelligent-capacitors-vs-active-filtering\/\">le premier guide CNBYG associ\u00e9<\/a> et <a href=\"https:\/\/cnbygele.com\/fr\/blog\/ieee-519-harmonic-limits-apf-sizing\/\">le deuxi\u00e8me guide CNBYG associ\u00e9<\/a>. Ni l'un ni l'autre ne remplace la preuve pour le bus ou le bus de liaison actuel.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-plan-integration-and-staged-verification\">Partie 5. Int\u00e9gration et v\u00e9rification par \u00e9tapes<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Les d\u00e9tails d'int\u00e9gration doivent figurer dans la d\u00e9finition du projet avant qu'une commande ne soit pass\u00e9e. Documentez l'espace disponible, la configuration des connexions, la topologie des feeders et des bus, la configuration des transformateurs de courant (TC) ou de r\u00e9f\u00e9rence, le routage des c\u00e2bles, la ventilation, l'acc\u00e8s, les communications, les alarmes, les contraintes d'arr\u00eat et les responsabilit\u00e9s de protection. Ces \u00e9l\u00e9ments fa\u00e7onnent \u00e0 la fois une installation pratique et un plan de mise en service transparent.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">La v\u00e9rification par \u00e9tapes devrait pr\u00e9server des conditions comparables. Documentez l'emplacement du compteur, l'\u00e9tat de fonctionnement, le statut de l'unit\u00e9 et la configuration pour chaque \u00e9tape. Comparez les r\u00e9sultats uniquement par rapport aux limites et aux m\u00e9thodes d'acceptation pr\u00e9alablement convenues ; d\u00e9placer un compteur ou modifier la composition de la charge peut modifier le r\u00e9sultat sans prouver un effet d'\u00e9quipement.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Pour le contexte des syst\u00e8mes industriels, les lecteurs peuvent \u00e9galement consulter <a href=\"https:\/\/www.energy.gov\/eere\/iedo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">Bureau de l'efficacit\u00e9 industrielle et de la d\u00e9carbonation du minist\u00e8re am\u00e9ricain de l'\u00c9nergie<\/a>. Ses ressources ne certifient pas une installation particuli\u00e8re ni n'\u00e9tablissent la conformit\u00e9 du projet.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-rfq-checklist-and-fit-boundary\">Partie 6. Liste de contr\u00f4le RFQ et limites de conformit\u00e9<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Une demande de devis (RFQ) doit inclure un sch\u00e9ma unifilaire actuel, la tension et la fr\u00e9quence nominales, les donn\u00e9es de source et de transformateur, les fichiers de mesure avec les d\u00e9tails du transformateur de courant, le calendrier d'exploitation, l'inventaire des charges, les d\u00e9tails des condensateurs\/bobines de r\u00e9actance\/filtres existants, les informations de protection, le lieu d'installation propos\u00e9, les informations sur l'espace et le refroidissement, les exigences de communication et la m\u00e9thode d'acceptation. D\u00e9terminez s'il s'agit d'une t\u00e2che de d\u00e9pannage local, d'une revue de bus commun, d'une r\u00e9gulation de puissance r\u00e9active, d'une att\u00e9nuation des courants harmoniques ou d'une mise en service coordonn\u00e9e.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG peut examiner les informations fournies par ses <a href=\"https:\/\/cnbygele.com\/fr\/contact-us\/\">page de contact<\/a> and discuss whether the product line fits the documented scope. It cannot convert this article into a guarantee of This is an objective-separation article, not a generic APF\/SVG comparison, a device-sizing method, or a claim that one technology solves both measured conditions.. Where utility coordination, safety, code, critical-load, or unusual operating requirements apply, involve the owner and qualified responsible engineering parties.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/static-var-compensator-manufacturer-selection-guide-product.webp\" alt=\"power factor vs harmonic distortion product recommendation and RFQ context\" \/><figcaption>Utilisez une port\u00e9e document\u00e9e et un dossier d'appel d'offres avant de demander une recommandation de produit.<\/figcaption><\/figure>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">Foire aux questions<\/h2>\n<h3 style=\"margin:28px 0 12px\">Can poor power factor and harmonic distortion occur together?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Yes. They are different electrical observations and can coexist, so measurements should preserve both the fundamental reactive trend and the current spectrum.<\/p>\n<h3 style=\"margin:28px 0 12px\">Does a capacitor bank solve harmonic distortion?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Not by default. Capacitors address a reactive-power objective only when the system review supports that role; their interaction with harmonic conditions must be evaluated.<\/p>\n<h3 style=\"margin:28px 0 12px\">When might an SVG be considered?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">An SVG may be discussed when dynamic reactive-power behavior is a defined project objective and the connection point, controls, capacity basis, and integration inputs are confirmed.<\/p>\n<h3 style=\"margin:28px 0 12px\">Une seule photographie peut-elle d\u00e9terminer l'\u00e9quipement d'att\u00e9nuation ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Non. L'emplacement du compteur, l'\u00e9tat de fonctionnement, la fen\u00eatre temporelle, la topologie du syst\u00e8me et l'objectif d\u00e9fini d\u00e9terminent si l'enregistrement est repr\u00e9sentatif.<\/p>\n<h3 style=\"margin:28px 0 12px\">Ce guide garantit-il un r\u00e9sultat de conformit\u00e9 ou op\u00e9rationnel ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Non. Les exigences applicables, les conditions du r\u00e9seau, les crit\u00e8res d'acceptation et la mise en service appartiennent au processus projet responsable.<\/p>\n<h3 style=\"margin:28px 0 12px\">Que devrait inclure une demande de soumission (RFQ) ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Fournir un sch\u00e9ma unifilaire, des donn\u00e9es \u00e9lectriques nominales, des mesures repr\u00e9sentatives, un calendrier d'exploitation, l'\u00e9quipement install\u00e9 et les contraintes d'installation.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">R\u00e9f\u00e9rences<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 Contr\u00f4le harmonique dans les syst\u00e8mes d'\u00e9nergie \u00e9lectrique<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\" rel=\"nofollow noopener\" target=\"_blank\">Normes et publications de la NEMA<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.energy.gov\/eere\/iedo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">D\u00e9partement de l'\u00c9nergie des \u00c9tats-Unis \u2014 Bureau de l'efficacit\u00e9 industrielle et de la d\u00e9carbonisation<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>A low displacement power factor and a high harmonic-current level are separate observations. One describes the phase relationship of fundamental current and voltage; the other describes non-sinusoidal current components. A project can have either condition, both conditions, or neither. For industrial distribution systems showing both power-factor variation and nonlinear current, the useful first step is [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2578","post","type-post","status-publish","format-standard","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts\/2578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/comments?post=2578"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts\/2578\/revisions"}],"predecessor-version":[{"id":2590,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/posts\/2578\/revisions\/2590"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/media?parent=2578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/categories?post=2578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/fr\/wp-json\/wp\/v2\/tags?post=2578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}