{"id":2580,"date":"2026-07-31T15:00:00","date_gmt":"2026-07-31T07:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2580"},"modified":"2026-08-24T18:08:51","modified_gmt":"2026-08-24T10:08:51","slug":"harmonic-impedance-scan-capacitor-bank-expansion","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/id\/blog\/harmonic-impedance-scan-capacitor-bank-expansion\/","title":{"rendered":"Using Harmonic Impedance Evidence Before Adding Capacitor Stages"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>An impedance scan is a study and evidence activity, not a catalog selection rule.<\/strong> It examines how the bus may respond across frequencies under defined network and switching scenarios before new capacitor stages change the existing electrical arrangement. For industrial buses where new capacitor stages are proposed alongside nonlinear loads, the useful first step is to define the connection point, the operating states that matter, and the decision that will be made from the record. A local feeder result can characterize a source, while a bus or PCC result supports a different system-level discussion. Those results should not be substituted for one another.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">Jawaban langsung<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">An impedance scan is a study and evidence activity, not a catalog selection rule. It examines how the bus may respond across frequencies under defined network and switching scenarios before new capacitor stages change the existing electrical arrangement. For industrial buses where new capacitor stages are proposed alongside nonlinear loads, the useful first step is to define the connection point, the operating states that matter, and the decision that will be made from the record. A local feeder result can characterize a source, while a bus or PCC result supports a different system-level discussion. Those results should not be substituted for one another.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can discuss its product-line context only after the objective is clear. This page does not promise New long-tail topic: it is limited to pre-expansion impedance evidence and scenario inputs, not a detuning-reactor selection recipe or a preventive-resonance overview.. For a broader framework, visit <a href=\"https:\/\/cnbygele.com\/id\/power-quality-system-guides\/\">Panduan Sistem Kualitas Daya CNBYG<\/a>.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/what-is-a-static-var-compensator-cover-2.webp\" alt=\"harmonic impedance scan capacitor bank expansion electrical assessment context\" \/><figcaption>Tentukan batas kelistrikan dan konteks operasional sebelum keputusan pemilihan atau pengujian.<\/figcaption><\/figure>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">Daftar Isi<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-define-the-decision-and-electrical-boundary\">Bagian 1. Tentukan keputusan dan batas kelistrikan<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-capture-representative-operating-states\">Bagian 2. Tangkap status pengoperasian yang representatif<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-keep-harmonic-reactive-and-operating-questions-separate\">Bagian 3. Pisahkan pertanyaan harmonik, reaktif, dan operasional<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-product-recommendation-with-a-fit-boundary\">Bagian 4. Rekomendasi produk dengan batas kecocokan<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-plan-integration-and-staged-verification\">Bagian 5. Integrasi rencana dan verifikasi bertahap<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-rfq-checklist-and-fit-boundary\">Bagian 6. Daftar periksa RFQ dan batas kesesuaian<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-define-the-decision-and-electrical-boundary\">Bagian 1. Tentukan keputusan dan batas kelistrikan<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Tim proyek harus menyatakan apakah mereka sedang menyelidiki pengamatan pengumpan, mendokumentasikan kondisi bus bersama, meninjau perilaku daya reaktif, merencanakan penggantian kapasitor, atau menguji beberapa unit. Tujuan yang disebutkan menentukan lokasi meter dan bukti yang dapat dibandingkan. Hal ini juga mencegah pembacaan diperlakukan sebagai kesimpulan tentang peralatan yang tidak terkait.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Record the meter position on the single-line diagram, voltage reference, CT ratio and polarity, aggregation method, and all major equipment active during the interval. Include single-line diagram, transformer data, cable and source information, measured spectrum, existing stages, and proposed switching scenarios. The site record should name the bus, feeder, transformer secondary, or point of common coupling in plain language so that suppliers and owners interpret the data consistently.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Pertanyaan keputusan<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Bukti yang harus disimpan<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Batas yang didukungnya<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Apa yang terjadi di sumber lokal?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Spektrum saat ini, tren RMS, kondisi beban, susunan CT<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Karakterisasi penyulang<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Apa yang terjadi pada bus umum?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tren tegangan\/arus, beban puncak (demand), konteks sumber dan trafo<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Penilaian Bus atau PCC<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Apakah kondisi yang diamati dapat diulang?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Peristiwa yang diberi waktu (time-stamped) di seluruh status pengoperasian yang representatif<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Permintaan penawaran (RFQ) dan perencanaan pengoperasian<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Apa yang sudah terhubung?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Inventaris kapasitor, reaktor, filter, penggerak, dan proteksi<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Tinjauan interaksi<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-capture-representative-operating-states\">Bagian 2. Tangkap status pengoperasian yang representatif<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The measurement window should reflect the way the system actually runs. For this topic, document industrial buses where new capacitor stages are proposed alongside nonlinear loads during normal operation, transition events, planned switching states, and any coincident nonlinear loads that share the assessed bus. A single quiet period cannot show how a proposed change will interact with the electrical system under a different source or load condition.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Gunakan log operasi bertanda waktu bersamaan dengan pengukuran listrik. Catat konfigurasi sumber, status tahap kapasitor, permulaan beban utama, alarm, dan pintasan pemeliharaan apa pun. Catatan yang disiplin ini memungkinkan untuk membedakan pola yang dapat berulang dari peristiwa singkat tanpa menyatakan bahwa satu perangkat menyebabkan setiap gejala yang terlihat.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The team can then use the scenario record to decide whether a detailed network study or a different project scope is required. If the available record does not include representative conditions, state that limitation in the RFQ rather than filling the gap with a nameplate assumption.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-keep-harmonic-reactive-and-operating-questions-separate\">Bagian 3. Pisahkan pertanyaan harmonik, reaktif, dan operasional<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Diskusi kualitas daya sering kali menggabungkan arus harmonik, permintaan daya reaktif, variasi tegangan, perilaku switching, dan masalah perlindungan. Hal tersebut saling berkaitan melalui jaringan tetapi bukanlah tujuan yang dapat saling menggantikan. Pemasok tidak seharusnya diminta untuk menyimpulkan solusi proyek secara lengkap hanya dari satu pembacaan persentase atau total beban terhubung.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Itu <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">Tinjauan standar IEEE 519<\/a> menyediakan konteks otoritas untuk kontrol harmonik, namun hal tersebut tidak menggantikan keputusan proyek mengenai titik penilaian yang berlaku, kumpulan data, kondisi jaringan, atau kriteria kontraktual. <a href=\"https:\/\/www.nema.org\/standards\" rel=\"nofollow noopener\" target=\"_blank\">Sumber standar NEMA<\/a> demikian pula berguna untuk konteks peralatan umum, bukan untuk menjamin hasil situs.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/what-is-a-static-var-compensator-body-2.webp\" alt=\"harmonic impedance scan capacitor bank expansion measurement and integration review\" \/><figcaption>Pengukuran, topologi, dan catatan operasi harus ditinjau bersama-sama sebelum mengubah peralatan.<\/figcaption><\/figure>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Kondisi yang sedang ditinjau<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Jangan berasumsi<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Pertanyaan proyek untuk diselesaikan<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Indikasi arus harmonik<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bahwa itu mendefinisikan kebutuhan daya reaktif<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Spektrum dan batasan apa yang relevan?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Variasi faktor daya<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bahwa itu mengidentifikasikan distorsi atau resonansi<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Perilaku kvar fundamental apa yang ada?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Peristiwa pensaklaran kapasitor<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bahwa pengaturan reaktor standar sudah sesuai<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Skenario dan input jaringan mana saja yang dinilai?<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Respons multi-unit<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pengaturan atau referensi CT tersebut sudah benar<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Bukti yang direkayasa apa yang mendukung penerimaan?<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-product-recommendation-with-a-fit-boundary\">Bagian 4. Rekomendasi produk dengan batas kecocokan<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Untuk tujuan proyek yang ditentukan, tinjau <a href=\"https:\/\/cnbygele.com\/id\/produk\/three-phase-series-filter-reactor\/\">CNBYG Three-Phase Series Filter Reactor<\/a> halaman produk beserta catatan kelistrikan yang sebenarnya. Halaman ini adalah titik awal untuk diskusi lini produk, bukan pengganti untuk pemilihan kapasitas, koordinasi proteksi, atau studi jaringan. Kesesuaian yang tepat bergantung pada titik sambung yang diusulkan, konfigurasi sistem, bukti pengukuran, kontrol, lingkungan termal, dan metode penerimaan yang disepakati.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Product recommendation: consider Three-Phase Series Filter Reactor only where its intended role matches a measured and documented objective. Do not recommend it when the main issue is unverified, solely upstream, outside the confirmed scope, or requires a different engineering control. This fit boundary is essential when existing capacitor banks, reactors, or multiple nonlinear sources are present.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Bacaan terkait dapat membantu pemilik membingkai pertanyaan yang berdekatan: <a href=\"https:\/\/cnbygele.com\/id\/blog\/preventing-capacitor-harmonic-resonance-in-industrial-systems\/\">panduan CNBYG terkait yang pertama<\/a> dan <a href=\"https:\/\/cnbygele.com\/id\/blog\/anti-harmonic-intelligent-capacitors-vs-active-filtering\/\">panduan CNBYG terkait yang kedua<\/a>. Keduanya tidak menggantikan bukti untuk bus atau pengumpan saat ini.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-plan-integration-and-staged-verification\">Bagian 5. Integrasi rencana dan verifikasi bertahap<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Detail integrasi harus dimasukkan ke dalam definisi proyek sebelum pesanan ditempatkan. Dokumentasikan ruang yang tersedia, susunan sambungan, topologi *feeder* dan bus, CT atau susunan referensi, perutean kabel, ventilasi, akses, komunikasi, alarm, batasan pemadaman, dan tanggung jawab proteksi. Masukan tersebut membentuk instalasi yang praktis sekaligus rencana pengujian yang transparan.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Verifikasi bertahap harus mempertahankan kondisi yang sebanding. Catat lokasi meteran, status pengoperasian, status unit, dan konfigurasi untuk setiap langkah. Bandingkan hasil hanya terhadap batasan dan metode penerimaan yang telah disepakati sebelumnya; memindahkan meteran atau mengubah komposisi beban dapat mengubah hasil tanpa membuktikan adanya efek peralatan.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Untuk konteks sistem industri, pembaca juga dapat merujuk pada <a href=\"https:\/\/www.energy.gov\/eere\/iedo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">Kantor Efisiensi Industri dan Dekarbonisasi Departemen Energi AS<\/a>. Sumber dayanya tidak menyatakan sertifikasi untuk instalasi tertentu atau menetapkan kepatuhan proyek.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-rfq-checklist-and-fit-boundary\">Bagian 6. Daftar periksa RFQ dan batas kesesuaian<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">RFQ harus mencakup diagram garis tunggal saat ini, tegangan dan frekuensi nominal, data sumber dan transformator, berkas meter dengan detail CT, jadwal operasi, inventaris beban, detail kapasitor\/reaktor\/filter yang ada, informasi proteksi, lokasi pemasangan yang diusulkan, informasi ruang dan pendinginan, persyaratan komunikasi, dan metode penerimaan. Identifikasikan apakah keputusan tersebut merupakan tugas pemecahan masalah lokal, peninjauan bus bersama, kontrol daya reaktif, mitigasi arus harmonik, atau pengujian yang terkoordinasi.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG dapat meninjau informasi yang diberikan melalui <a href=\"https:\/\/cnbygele.com\/id\/contact-us\/\">halaman kontak<\/a> and discuss whether the product line fits the documented scope. It cannot convert this article into a guarantee of New long-tail topic: it is limited to pre-expansion impedance evidence and scenario inputs, not a detuning-reactor selection recipe or a preventive-resonance overview.. Where utility coordination, safety, code, critical-load, or unusual operating requirements apply, involve the owner and qualified responsible engineering parties.<\/p>\n<figure style=\"margin:26px 0;text-align:center\"><img decoding=\"async\" style=\"max-width:640px;width:100%;height:auto;display:block;margin:0 auto;border-radius:8px\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/07\/what-is-a-static-var-compensator-product-1.webp\" alt=\"harmonic impedance scan capacitor bank expansion product recommendation and RFQ context\" \/><figcaption>Gunakan ruang lingkup yang didokumentasikan dan catatan RFQ sebelum meminta rekomendasi produk.<\/figcaption><\/figure>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">Pertanyaan yang sering diajukan<\/h2>\n<h3 style=\"margin:28px 0 12px\">Why scan impedance before expanding a capacitor bank?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">New stages can change the network response. A scenario-based review gives the project team evidence before a switching arrangement is altered.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can a scan select a detuning reactor by itself?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. Reactor selection needs a qualified network review covering ratings, switching duty, protection, installation, and the applicable project requirements.<\/p>\n<h3 style=\"margin:28px 0 12px\">Which operating scenarios should be represented?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Include defined source configurations, expected load states, existing and proposed capacitor stages, and any material nonlinear-load operating conditions.<\/p>\n<h3 style=\"margin:28px 0 12px\">Dapatkah satu foto (atau *snapshot*) menentukan peralatan mitigasi?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Tidak. Lokasi meteran, status pengoperasian, jendela waktu, topologi sistem, dan tujuan yang ditentukan menentukan apakah catatan tersebut representatif.<\/p>\n<h3 style=\"margin:28px 0 12px\">Apakah panduan ini menjamin hasil kepatuhan atau operasional?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Tidak. Persyaratan yang berlaku, kondisi jaringan, kriteria penerimaan, dan pengujian (commissioning) termasuk dalam proses proyek yang bertanggung jawab.<\/p>\n<h3 style=\"margin:28px 0 12px\">Apa saja yang harus disertakan dalam RFQ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Sediakan diagram satu garis, data kelistrikan nominal, pengukuran representatif, jadwal operasi, peralatan terpasang, dan batasan instalasi.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">Referensi<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 Pengendalian Harmonisa dalam Sistem Daya Listrik<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\" rel=\"nofollow noopener\" target=\"_blank\">Standar dan Publikasi NEMA<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.energy.gov\/eere\/iedo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">Departemen Energi AS \u2014 Kantor Efisiensi Industri dan Dekarbonisasi<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>An impedance scan is a study and evidence activity, not a catalog selection rule. It examines how the bus may respond across frequencies under defined network and switching scenarios before new capacitor stages change the existing electrical arrangement. For industrial buses where new capacitor stages are proposed alongside nonlinear loads, the useful first step is [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2580","post","type-post","status-publish","format-standard","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/posts\/2580","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/comments?post=2580"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/posts\/2580\/revisions"}],"predecessor-version":[{"id":2588,"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/posts\/2580\/revisions\/2588"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/media?parent=2580"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/categories?post=2580"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/id\/wp-json\/wp\/v2\/tags?post=2580"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}