Harmónicos do Fator K em Transformadores: Guia de Projeto de Distribuição 20
Julho

Harmónicos do Fator K em Transformadores: Guia de Projeto de Distribuição

Distribution transformers serving non-linear loads and harmonic-current design reviews should be assessed as part of an electrical system, not treated as a standalone harmonic label. Start by defining the connection···

Ler mais
Anti-Harmonic Intelligent Capacitors vs Active Filtering 20
Julho

Anti-Harmonic Intelligent Capacitors vs Active Filtering

Anti-harmonic intelligent capacitor applications and active harmonic filtering alternatives should be assessed as part of an electrical system, not treated as a standalone harmonic label. Start by defining the connection···

Ler mais
Semiconductor Fab Power Quality: Reactive Management 19
Julho

Semiconductor Fab Power Quality: Reactive Management

Semiconductor fabrication facilities and sensitive cleanroom electrical loads should be assessed as part of an electrical system, not treated as a standalone harmonic label. Start by defining the connection point,···

Ler mais
Wastewater Pump VFD Harmonics: Mitigation Planning 19
Julho

Wastewater Pump VFD Harmonics: Mitigation Planning

Water and wastewater pump stations with variable-frequency drives should be assessed as part of an electrical system, not treated as a standalone harmonic label. Start by defining the connection point,···

Ler mais
Harmónicas de Fornos de Arco: Guia de Limites de Aplicação de APF 18
Julho

Harmónicas de Fornos de Arco: Guia de Limites de Aplicação de APF

Electric arc furnaces, ladle furnaces, and steel-mill auxiliary loads should be assessed as part of an electrical system, not treated as a standalone harmonic label. Start by defining the connection···

Ler mais