{"id":4087,"date":"2026-11-18T17:00:00","date_gmt":"2026-11-18T09:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=4087"},"modified":"2026-11-17T05:42:35","modified_gmt":"2026-11-16T21:42:35","slug":"ahf-end-of-life-disposal-handover","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/pt\/blog\/ahf-end-of-life-disposal-handover\/","title":{"rendered":"AHF End of Life: Decommissioning and Recycling Handover"},"content":{"rendered":"<p>An AHF end of life handover should establish the equipment identity, the authorized electrical release, the intended destination and the evidence that the receiving organization accepted it. Retirement is not simply putting a filter beside a scrap container. An active harmonic filter may require controlled removal, assessment of its actual construction and a suitable electronics recovery route. This guide provides a practical record framework for owners and maintenance teams. It does not declare any CNBYG model hazardous, recyclable in a particular percentage or eligible for a specific waste classification. Confirm the actual product information and local requirements before transfer.<\/p>\n<h2>Decide what \u201cend of life\u201d means for this asset<\/h2>\n<p>Separate a service decision from a disposal decision. A unit removed during a plant upgrade might remain a candidate for authorized evaluation or reuse. A unit declared waste needs an appropriate waste route. An untested spare should not be described as a verified serviceable replacement merely because its enclosure looks intact.<\/p>\n<p>Record why retirement is proposed: an approved system change, a service assessment, physical damage or another documented reason. Avoid assigning an arbitrary lifetime to the product family. The actual equipment condition, application and available assessment matter more than a generic calendar estimate. If the reason is unknown, preserve that uncertainty in the record instead of inventing a failure history.<\/p>\n<p>The <a href=\"https:\/\/cnbygele.com\/product\/ahf-active-harmonic-filter-harmonic-control\/\">CNBYG AHF product page<\/a> is the relevant starting point for identifying the family and requesting product information. It does not establish the composition or service status of an individual installed unit. Ask for model-specific information where the retirement decision depends on internal materials, construction or approved handling.<\/p>\n<h2>Name the owner of each decision<\/h2>\n<p>Identify the person authorized to retire the asset, the competent person responsible for electrical work and the organization accepting the equipment. These roles may belong to different parties. Procurement can organize a collection without having authority to decide that the unit is electrically safe or that a particular waste classification applies.<\/p>\n<p>Agree the intended end state before work starts. Does the handover include only a removed filter, or also its mounting arrangement, external controls and associated site work? Will the plant retain any records or accessories? Define those boundaries in the work scope. Otherwise an apparently complete collection can leave unidentified equipment, unsafe interfaces or unresolved records behind.<\/p>\n<p>Create a short escalation route for discrepancies. If the collection team finds damage or the equipment identity differs from the list, it should know whom to contact before loading. A controlled pause at that point is more useful than an incomplete receipt issued after the unit has disappeared into a mixed shipment.<\/p>\n<h2>Treat electrical release as competent work<\/h2>\n<p>The removal plan must address all relevant energy sources, stored energy and the installation&#8217;s specific interfaces. An off screen, open switch or elapsed assumed waiting period does not establish a safe condition. Use the actual equipment instructions and the site&#8217;s approved system of work. This article provides no live-work steps or generic capacitor discharge method.<\/p>\n<p>The <a href=\"https:\/\/www.hse.gov.uk\/pubns\/priced\/hsr25.pdf\" rel=\"noopener nofollow\" target=\"_blank\">HSE electricity at work guidance<\/a> provides a general explanation of electrical precautions and competence in its UK context. Apply the requirements relevant to the installation and obtain the responsible assessment. A collection receipt cannot retrospectively establish that removal was performed safely.<\/p>\n<p>Document how the remaining installation is left. Removed equipment may be connected to external sensing, controls or communication paths. The responsible personnel should determine the required treatment of those interfaces. Retain the electrical work record separately from the logistics receipt so that each demonstrates the decision it actually supports.<\/p>\n<h2>Identify the removed equipment before losing traceability<\/h2>\n<p>Record the model, serial reference where available, site asset number, former location and retirement reason. Take accessible external identification photographs through the approved work process. Link these to the removal record. If a label is damaged or missing, preserve the available evidence and use an agreed identification method rather than assigning a guessed serial number.<\/p>\n<p>Keep the unit intact until the appropriate assessment and treatment route are agreed. Informal dismantling can destroy useful identification and introduce risks. A collection contractor may require particular preparation, but that preparation should be established from the actual equipment and the contractor&#8217;s accepted scope, not from general online recycling advice.<\/p>\n<p>For equipment with records or settings, assess what information should be retained or protected. Do not assume the filter stores personal data, supports a factory reset or has a removable storage device. Ask what applies to the delivered model. The related <a href=\"https:\/\/cnbygele.com\/blog\/meter-decommissioning-data-handover\/\">meter decommissioning data handover guide<\/a> illustrates a separate record-preservation problem; it is not evidence that an AHF has meter-like storage functions.<\/p>\n<p><figure><img decoding=\"async\" alt=\"CNBYG AHF unit at recycling handover inspection station\" class=\"wp-image-4082\" height=\"1024\" loading=\"lazy\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117.png\" style=\"max-width:100%;height:auto\" width=\"1536\" srcset=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117.png 1536w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117-300x200.png 300w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117-1024x683.png 1024w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117-768x512.png 768w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117-18x12.png 18w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-inspection-20261117-600x400.png 600w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Illustration generated using the actual CNBYG product photograph. Disconnected equipment and paperwork illustrate record review; they are not evidence of a completed test, safe isolation, service authorization or disposal certification.<\/figcaption><\/figure>\n<\/p>\n<h2>Assess materials through evidence, not appearance<\/h2>\n<p>Request relevant product construction information and disclose the observed condition to the receiving organization. Do not classify an intact electronic assembly as clean scrap metal solely because its housing is metallic. Conversely, do not claim that it contains a particular hazardous substance without evidence. Different models, ages and site incidents can require different assessments.<\/p>\n<p>If there has been contamination, fire or water exposure, say so before agreeing collection. The condition can affect handling and the receiving facility&#8217;s acceptance. Preserve incident records rather than cleaning or opening the unit simply to make it resemble an ordinary end-of-life item. Obtain specialist direction where the condition or applicable classification is unclear.<\/p>\n<p>The <a href=\"https:\/\/www.epa.gov\/recycle\/electronics-donation-and-recycling\" rel=\"noopener nofollow\" target=\"_blank\">US EPA electronics recycling guidance<\/a> explains the value of appropriate reuse and recycling routes. Its consumer-oriented examples do not determine the classification of an industrial AHF. Use it as general context, then verify the local route for the actual asset, construction and condition.<\/p>\n<h2>Confirm the receiver can accept the actual equipment<\/h2>\n<p>Ask the proposed recycler or treatment organization to confirm the equipment category, condition, size and any declared special circumstances it will accept. Obtain the destination and responsible contact. A company collecting general office electronics may not automatically accept industrial power electronics or damaged equipment.<\/p>\n<p>Check the evidence behind claims about competence or certification. The <a href=\"https:\/\/www.epa.gov\/smm-electronics\/certified-electronics-recyclers\" rel=\"noopener nofollow\" target=\"_blank\">EPA certified electronics recyclers page<\/a> describes the R2 and e-Stewards programs and encourages using suitable certified recyclers. A certification claim still needs a current scope and relevant facility check. It does not establish universal legal acceptance for every shipment or jurisdiction.<\/p>\n<p>Ask what receipt and downstream evidence will be provided. Agree the asset reference or batch mapping needed to reconcile the collection. If several units travel together, make sure the plant can connect its retired asset to the acknowledged batch. Avoid accepting a generic weight ticket as proof of individual treatment unless that is sufficient for the agreed record purpose.<\/p>\n<h2>Use a handover matrix to prevent missing decisions<\/h2>\n<p>The following is a recommended project checklist. It is not a legally complete waste-transfer form. Required documents, classifications and retention periods depend on the applicable jurisdiction and the actual transaction.<\/p>\n<div style=\"overflow-x:auto;max-width:100%\">\n<table style=\"border-collapse:collapse;width:100%;min-width:560px\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Handover stage<\/th>\n<th style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Record to retain<\/th>\n<th style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Acceptance question<\/th>\n<th style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Role to resolve uncertainty<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Retirement approval<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Asset identity, reason and authorized decision<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Is this reuse, evaluation or waste transfer?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Asset owner<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Electrical removal<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Approved scope and completed release record<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Has the electrical work been concluded under the site procedure?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Responsible competent person<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Condition assessment<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Accessible photographs and incident history<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Has unusual damage or contamination been disclosed?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Equipment owner and appropriate assessor<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Receiver agreement<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Destination, contact and written acceptance scope<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Will this facility accept the actual unit and condition?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Receiving organization<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Transport preparation<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Agreed packing, package count and handling information<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Does the carrier have the information needed for the accepted movement?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Logistics lead and carrier<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Physical transfer<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Signed receipt linked to asset or batch<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Did the expected organization accept the listed items?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Dispatch and receiving representatives<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Record closeout<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Receipt, discrepancies and agreed treatment evidence<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Can the retirement decision be traced to the final handover?<\/td>\n<td style=\"border:1px solid #d1d5db;padding:10px;text-align:left;vertical-align:top;white-space:normal;overflow-wrap:anywhere\">Asset record owner<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Do not close the asset record simply because a collection date is booked. Booking, loading, receiving and treatment are separate events. Record the event actually demonstrated by each document. If final treatment evidence has not arrived, retain an outstanding action with an owner and follow-up date.<\/p>\n<h2>Prepare the shipment without turning it into a scrap demonstration<\/h2>\n<p>Agree supports, packaging and handling based on the actual equipment and the receiver&#8217;s requirements. Protect interfaces from avoidable transport damage and prevent loose accessories from moving against the unit. Confirm the mass and handling provisions from reliable product or measured information where needed; do not estimate lifting requirements from a website photograph.<\/p>\n<p>Use condition photographs before packing and identify the package count. Keep the handover documents accessible to the receiving team in the agreed way. If the unit must be segregated pending assessment, mark its status through the site&#8217;s established method without claiming that an informal tag constitutes a legally sufficient transport label.<\/p>\n<p>The related <a href=\"https:\/\/cnbygele.com\/blog\/active-harmonic-filter-maintenance-schedule\/\">AHF maintenance schedule guide<\/a> helps distinguish retained service equipment from a retired asset. Update the plant record so that an old unit is not accidentally returned to the spare inventory. Where a replacement is installed, preserve a clear break between the old identity and the new equipment&#8217;s commissioning record.<\/p>\n<p><figure><img decoding=\"async\" alt=\"CNBYG AHF unit at recycling handover records station\" class=\"wp-image-4085\" height=\"1024\" loading=\"lazy\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117.png\" style=\"max-width:100%;height:auto\" width=\"1536\" srcset=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117.png 1536w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117-300x200.png 300w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117-1024x683.png 1024w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117-768x512.png 768w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117-18x12.png 18w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/11\/ahf-end-of-life-disposal-handover-records-20261117-600x400.png 600w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Illustration generated using the actual CNBYG product photograph. Disconnected equipment and paperwork illustrate record review; they are not evidence of a completed test, safe isolation, service authorization or disposal certification.<\/figcaption><\/figure>\n<\/p>\n<h2>Reconcile the receipt before closing the asset<\/h2>\n<p>Compare the receiving acknowledgement with the dispatch list. Check equipment or batch identity, quantity, date, destination and any discrepancies. Resolve missing items or rejected conditions while the transport and receiving evidence remain available. A receipt for fewer packages should not be filed as though the complete retirement scope has been accepted.<\/p>\n<p>Retain the final decision, removal record, condition evidence, receiver agreement and acknowledgement in one indexed package. The index should be understandable to a later reviewer who did not attend the collection. If subsequent recycling or treatment evidence is part of the agreement, link it when received and keep a follow-up open until then.<\/p>\n<p>Avoid unsupported environmental claims. A collection receipt does not establish a recycling percentage, carbon saving or destruction of every component. Report the outcome shown by the evidence. For operational understanding before replacement planning, the <a href=\"https:\/\/cnbygele.com\/blog\/active-harmonic-filter-working-principle\/\">active harmonic filter working principle<\/a> explains the equipment&#8217;s role without substituting for an engineering assessment of the remaining system.<\/p>\n<h2>Hazardous energy awareness before decommissioning<\/h2>\n<p>This US Department of Labor electrical panel accident lesson supports awareness of energy control responsibilities. It is educational background for planning removal, not a model-specific decommissioning procedure or a recycling instruction.<\/p>\n<div style=\"position:relative;padding-bottom:56.25%;height:0;overflow:hidden\"><iframe allowfullscreen=\"\" loading=\"lazy\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/-XiBHmsYOw0\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\" title=\"Electrical Panel Repair Results in Electrocution\"><\/iframe><\/div>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=-XiBHmsYOw0\" rel=\"noopener nofollow\" target=\"_blank\">Watch the educational lesson<\/a><\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>Is an AHF automatically hazardous waste?<\/h3>\n<p>No classification should be inferred from the product name alone. Assess the actual equipment, condition and applicable requirements with the appropriate information and competent advice.<\/p>\n<h3>Does a recycler&#8217;s certificate cover every industrial filter?<\/h3>\n<p>Do not assume that it does. Confirm the current facility scope, accepted equipment and condition, and the requirements applying to the intended transfer.<\/p>\n<h3>Is a collection receipt proof that recycling is complete?<\/h3>\n<p>A collection receipt proves only the event and items it records. Obtain any separately agreed receiving or treatment evidence before reporting that those later stages are complete.<\/p>\n<h3>Should the unit be dismantled before collection?<\/h3>\n<p>Only when the actual equipment assessment, competent work plan and receiving instructions establish that preparation. Informal dismantling can create hazards and destroy traceability.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Is an AHF automatically hazardous waste?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No classification should be inferred from the product name alone. Assess the actual equipment, condition and applicable requirements with the appropriate information and competent advice.\"}}, {\"@type\": \"Question\", \"name\": \"Does a recycler's certificate cover every industrial filter?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Do not assume that it does. Confirm the current facility scope, accepted equipment and condition, and the requirements applying to the intended transfer.\"}}, {\"@type\": \"Question\", \"name\": \"Is a collection receipt proof that recycling is complete?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"A collection receipt proves only the event and items it records. Obtain any separately agreed receiving or treatment evidence before reporting that those later stages are complete.\"}}, {\"@type\": \"Question\", \"name\": \"Should the unit be dismantled before collection?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Only when the actual equipment assessment, competent work plan and receiving instructions establish that preparation. Informal dismantling can create hazards and destroy traceability.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plan an AHF end of life handover with safe isolation, equipment identity, recycler acceptance and disposal records without assuming material composition.<\/p>","protected":false},"author":4,"featured_media":4081,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[219],"class_list":["post-4087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-active-harmonic-filter"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/posts\/4087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/comments?post=4087"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/posts\/4087\/revisions"}],"predecessor-version":[{"id":4089,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/posts\/4087\/revisions\/4089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/media\/4081"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/media?parent=4087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/categories?post=4087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/pt\/wp-json\/wp\/v2\/tags?post=4087"}],"curies":[{"name":"bem jogado","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}