{"id":2222,"date":"2026-07-28T15:00:00","date_gmt":"2026-07-28T07:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2222"},"modified":"2026-07-29T00:12:58","modified_gmt":"2026-07-28T16:12:58","slug":"oem-apf-svg-panel-builder-integration","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/ru\/blog\/oem-apf-svg-panel-builder-integration\/","title":{"rendered":"OEM APF \u0438 SVG \u0418\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0438\u044f \u0434\u043b\u044f \u0440\u0443\u043a\u043e\u0432\u043e\u0434\u0441\u0442\u0432\u0430 \u043f\u043e \u0441\u0431\u043e\u0440\u0449\u0438\u043a\u0430\u043c \u043f\u0430\u043d\u0435\u043b\u0435\u0439"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Oem panel integration interfaces for apf and svg equipment should begin with a documented electrical boundary, representative operating record, and a defined decision.<\/strong> \u041f\u043e\u043a\u0430\u0437\u0430\u043d\u0438\u0435 \u043f\u0440\u0438\u0431\u043e\u0440\u0430, \u0437\u0430\u0432\u043e\u0434\u0441\u043a\u0430\u044f \u0442\u0430\u0431\u043b\u0438\u0447\u043a\u0430 \u043a\u043e\u043c\u043f\u043e\u043d\u0435\u043d\u0442\u0430 \u0438\u043b\u0438 \u043e\u0442\u0434\u0435\u043b\u044c\u043d\u043e\u0435 \u0441\u043e\u0431\u044b\u0442\u0438\u0435 \u043f\u0435\u0440\u0435\u043a\u043b\u044e\u0447\u0435\u043d\u0438\u044f \u0441\u0430\u043c\u0438 \u043f\u043e \u0441\u0435\u0431\u0435 \u043d\u0435 \u043e\u043f\u0440\u0435\u0434\u0435\u043b\u044f\u044e\u0442 \u043f\u0440\u0438\u0447\u0438\u043d\u0443, \u043d\u0435\u043e\u0431\u0445\u043e\u0434\u0438\u043c\u043e\u0435 \u043e\u0431\u043e\u0440\u0443\u0434\u043e\u0432\u0430\u043d\u0438\u0435 \u0438\u043b\u0438 \u043a\u0440\u0438\u0442\u0435\u0440\u0438\u0438 \u043f\u0440\u0438\u0435\u043c\u043a\u0438.<\/p>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">\u0421\u043e\u0434\u0435\u0440\u0436\u0430\u043d\u0438\u0435<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#part-1-define-the-decision-boundary\">Part 1. Define the decision boundary<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-2-capture-representative-operating-states\">\u0427\u0430\u0441\u0442\u044c 2. \u0417\u0430\u0445\u0432\u0430\u0442 \u0440\u0435\u043f\u0440\u0435\u0437\u0435\u043d\u0442\u0430\u0442\u0438\u0432\u043d\u044b\u0445 \u0440\u0430\u0431\u043e\u0447\u0438\u0445 \u0441\u043e\u0441\u0442\u043e\u044f\u043d\u0438\u0439<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-3-keep-standards-and-installation-responsibilities-explicit\">Part 3. Keep standards and installation responsibilities explicit<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-4-compare-paths-without-defaulting-to-one-device\">Part 4. Compare paths without defaulting to one device<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-5-plan-interfaces-and-commissioning-early\">Part 5. Plan interfaces and commissioning early<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#part-6-rfq-checklist-and-fit-boundary\">\u0427\u0430\u0441\u0442\u044c 6. \u0427\u0435\u043a-\u043b\u0438\u0441\u0442 \u0437\u0430\u043f\u0440\u043e\u0441\u0430 \u043d\u0430 \u043a\u043e\u043c\u043c\u0435\u0440\u0447\u0435\u0441\u043a\u043e\u0435 \u043f\u0440\u0435\u0434\u043b\u043e\u0436\u0435\u043d\u0438\u0435 \u0438 \u0433\u0440\u0430\u043d\u0438\u0446\u044b \u0441\u043e\u043e\u0442\u0432\u0435\u0442\u0441\u0442\u0432\u0438\u044f<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">\u041f\u0440\u044f\u043c\u043e\u0439 \u043e\u0442\u0432\u0435\u0442<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Oem panel integration interfaces for apf and svg equipment should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate, or a single switching event does not by itself establish the cause, the required equipment, or the acceptance criteria.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can discuss SVG Static Var Generators product-line context when the recorded evidence supports a defined objective. It cannot establish a finished panel design, a UL listing claim, or assurance that any enclosure will meet a customer&#8217;s project requirements from an article. For broader navigation, see <a href=\"https:\/\/cnbygele.com\/ru\/power-quality-system-guides\/\">\u0420\u0443\u043a\u043e\u0432\u043e\u0434\u0441\u0442\u0432\u0430 \u043f\u043e \u0441\u0438\u0441\u0442\u0435\u043c\u0430\u043c \u043a\u0430\u0447\u0435\u0441\u0442\u0432\u0430 \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u044d\u043d\u0435\u0440\u0433\u0438\u0438<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-1-define-the-decision-boundary\">Part 1. Define the decision boundary<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Start by naming the point where the result will be used. A feeder measurement characterizes a local source; a service entrance, transformer secondary, or PCC measurement supports a system-boundary question. Record meter location, voltage reference, CT ratio and polarity, sample interval, aggregation period, and other major loads connected at the time.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For panel-builder assemblies that combine compensation equipment, protection, controls, and customer switchgear, the operating log should identify factory panel layout review, proposed CT routing, thermal-load review, and customer switchgear interface checks. Time stamps matter because a change in load, source configuration, or capacitor state can alter the observed waveform without proving an equipment fault.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u0412\u043e\u043f\u0440\u043e\u0441 \u043f\u043e \u0438\u0437\u043c\u0435\u0440\u0435\u043d\u0438\u044f\u043c<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">\u0414\u043e\u043a\u0430\u0437\u0430\u0442\u0435\u043b\u044c\u0441\u0442\u0432\u0430 \u0434\u043b\u044f \u0441\u043e\u0445\u0440\u0430\u043d\u0435\u043d\u0438\u044f<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Decision supported<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">What occurs at the OEM panel main bus and defined compensation connection point?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Current\/voltage trends, spectra, CT position, operating state<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Source characterization<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">What changes at the system boundary?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Demand, source and transformer data, switching record<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Project target definition<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u041f\u043e\u0432\u0442\u043e\u0440\u044f\u0435\u043c\u043e \u043b\u0438 \u0441\u043e\u0441\u0442\u043e\u044f\u043d\u0438\u0435?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Multiple representative operating windows<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u041f\u043b\u0430\u043d\u0438\u0440\u043e\u0432\u0430\u043d\u0438\u0435 \u043c\u043e\u0449\u043d\u043e\u0441\u0442\u0435\u0439 \u0438 \u0432\u0432\u043e\u0434\u0430 \u0432 \u044d\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0438\u044e<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">What is already installed?<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">\u041e\u0434\u043d\u043e\u043b\u0438\u043d\u0435\u0439\u043d\u0430\u044f \u0441\u0445\u0435\u043c\u0430, \u0434\u0435\u0442\u0430\u043b\u0438 \u043a\u043e\u043d\u0434\u0435\u043d\u0441\u0430\u0442\u043e\u0440\u043d\u043e\u0439\/\u0440\u0435\u0430\u043a\u0442\u043e\u0440\u043d\u043e\u0439\/\u0444\u0438\u043b\u044c\u0442\u0440\u043e\u0432\u043e\u0439 \u0443\u0441\u0442\u0430\u043d\u043e\u0432\u043a\u0438 \u0438 \u0437\u0430\u0449\u0438\u0442\u044b<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Integration review<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-2-capture-representative-operating-states\">\u0427\u0430\u0441\u0442\u044c 2. \u0417\u0430\u0445\u0432\u0430\u0442 \u0440\u0435\u043f\u0440\u0435\u0437\u0435\u043d\u0442\u0430\u0442\u0438\u0432\u043d\u044b\u0445 \u0440\u0430\u0431\u043e\u0447\u0438\u0445 \u0441\u043e\u0441\u0442\u043e\u044f\u043d\u0438\u0439<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">An effective record uses more than a snapshot. Log normal and abnormal windows, note the sequence of switching or control events, and preserve the settings used by the analyzer. Where individual feeders are available, correlate them with the bus result rather than assuming that one load explains every change.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Keep a baseline before any physical change. The baseline should include RMS voltage and current, harmonic spectrum, demand, reactive-power trend, equipment state, and the operating schedule. If a later comparison uses another meter position or another production condition, label that limitation rather than treating unlike data as proof of improvement.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-3-keep-standards-and-installation-responsibilities-explicit\">Part 3. Keep standards and installation responsibilities explicit<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u0417\u0435\u043c\u043b\u044f <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">\u041e\u0431\u0437\u043e\u0440 IEEE 519<\/a> provides context for harmonic-control discussions, but it is not a universal sizing instruction. The applicable assessment point, source characteristics, operating data, and contractual criteria must be established for the project.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For U.S. work, <a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-70-standard-development\/70\" rel=\"nofollow noopener\" target=\"_blank\">NFPA 70 \/ NEC<\/a> is relevant code context, subject to the adopted edition, local amendments, equipment instructions, and AHJ review. Disconnects, overcurrent protection, conductors, grounding and bonding, labeling, working space, and access should be resolved by the responsible design and installation team.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-4-compare-paths-without-defaulting-to-one-device\">Part 4. Compare paths without defaulting to one device<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">The selected path should follow the measured objective. Harmonic current, reactive demand, voltage events, installation defects, and upstream conditions can occur together, yet they need different evidence and acceptance methods. Existing compensation, reactors, filters, source impedance, protection, and expected load variation all influence a project review.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">| Option category | May be considered when | Must be confirmed |<br \/>\n|&#8212;|&#8212;|&#8212;|| AHF \/ APF | Measured harmonic-current mitigation is the objective | Current profile, CT plan, location, capacity, protection, heat |<br \/>\n| SVG | Dynamic reactive-power behavior is the objective | Reactive profile, voltage context, controls, existing equipment |<br \/>\n| Series reactor \/ passive components | A system study defines a fixed or tuned function | Resonance, switching, network data, physical installation |<br \/>\n| Operational or upstream change | Source, schedule, or topology is material | Owner duties, utility coordination, implementation path |<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u0414\u043b\u044f \u043e\u0431\u0441\u0443\u0436\u0434\u0435\u043d\u0438\u044f \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u043e\u0432\u043e\u0439 \u043b\u0438\u043d\u0435\u0439\u043a\u0438 \u0441\u043c. <a href=\"https:\/\/cnbygele.com\/ru\/product\/svg-static-var-generators\/\">\u0421\u0442\u0430\u0442\u0438\u0447\u0435\u0441\u043a\u0438\u0435 \u0433\u0435\u043d\u0435\u0440\u0430\u0442\u043e\u0440\u044b \u0440\u0435\u0430\u043a\u0442\u0438\u0432\u043d\u043e\u0439 \u043c\u043e\u0449\u043d\u043e\u0441\u0442\u0438 CNBYG SVG<\/a>. This is a product recommendation boundary, not a conclusion that the product is suitable for every observed condition. The related guide on <a href=\"https:\/\/cnbygele.com\/ru\/blog\/vfd-harmonics-industrial-plants-apf-selection\/\">VFD harmonics and APF selection<\/a> provides a neighboring measurement-led perspective.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-5-plan-interfaces-and-commissioning-early\">Part 5. Plan interfaces and commissioning early<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Before an RFQ, document the proposed connection location, CT arrangement, feeder and bus topology, available fault-current information, cable routes, ventilation, environmental conditions, access, communications, alarms, and maintenance expectations. Those inputs keep a quotation discussion tied to the actual integration scope.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Commissioning should compare like operating states against a pre-agreed baseline and acceptance method. Retain the meter position, analyzer setup, and major load state for both records. A changed meter location or changed operating condition can produce a different result without proving a change in equipment performance. See <a href=\"https:\/\/cnbygele.com\/ru\/blog\/anti-harmonic-intelligent-capacitors-vs-active-filtering\/\">Intelligent capacitors versus active filtering<\/a> for related planning context.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"part-6-rfq-checklist-and-fit-boundary\">\u0427\u0430\u0441\u0442\u044c 6. \u0427\u0435\u043a-\u043b\u0438\u0441\u0442 \u0437\u0430\u043f\u0440\u043e\u0441\u0430 \u043d\u0430 \u043a\u043e\u043c\u043c\u0435\u0440\u0447\u0435\u0441\u043a\u043e\u0435 \u043f\u0440\u0435\u0434\u043b\u043e\u0436\u0435\u043d\u0438\u0435 \u0438 \u0433\u0440\u0430\u043d\u0438\u0446\u044b \u0441\u043e\u043e\u0442\u0432\u0435\u0442\u0441\u0442\u0432\u0438\u044f<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">An inquiry is more useful with a single-line diagram, nominal voltage and frequency, transformer data, representative voltage\/current records, load schedule, existing capacitor\/reactor\/filter inventory, protection data, proposed installation point, space and cooling details, and communication requirements. State whether the decision concerns local troubleshooting, a system boundary, harmonic current, reactive response, or an integration review.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can review these inputs and discuss product-line fit. It should not be asked to promise a finished panel design, a UL listing claim, or assurance that any enclosure will meet a customer&#8217;s project requirements. For regulated, critical, or unusual conditions, involve the owner, qualified engineer, installer, utility where relevant, and AHJ. Submit the available project information through the <a href=\"https:\/\/cnbygele.com\/ru\/contact-us\/\">\u0421\u0442\u0440\u0430\u043d\u0438\u0446\u0430 \u043a\u043e\u043d\u0442\u0430\u043a\u0442\u043e\u0432 CNBYG<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/h2>\n<h3 style=\"margin:28px 0 12px\">What should an OEM define before selecting an APF or SVG interface?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Define the single-line position, voltage and frequency, CT reference, protection arrangement, thermal constraints, communications needs, and the measured objective.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can a panel builder claim a finished assembly is listed from a component datasheet?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. Listing, enclosure construction, and customer acceptance depend on the complete assembly and the responsible certification and inspection process.<\/p>\n<h3 style=\"margin:28px 0 12px\">Why is CT routing part of panel integration?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">CT location, ratio, polarity, secondary protection, and cable routing determine the signal available to a compensation controller and must be coordinated before commissioning.<\/p>\n<h3 style=\"margin:28px 0 12px\">\u0414\u043e\u0441\u0442\u0430\u0442\u043e\u0447\u043d\u043e \u043b\u0438 \u043e\u0434\u043d\u043e\u0433\u043e \u0438\u0437\u043c\u0435\u0440\u0435\u043d\u0438\u044f \u0434\u043b\u044f \u0432\u044b\u0431\u043e\u0440\u0430 \u043e\u0431\u043e\u0440\u0443\u0434\u043e\u0432\u0430\u043d\u0438\u044f \u0434\u043b\u044f \u0441\u043c\u044f\u0433\u0447\u0435\u043d\u0438\u044f \u043f\u043e\u0441\u043b\u0435\u0434\u0441\u0442\u0432\u0438\u0439?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Usually not. Meter location, operating condition, duration, electrical topology, and the project objective determine whether the data is representative.<\/p>\n<h3 style=\"margin:28px 0 12px\">Can equipment be selected from connected load alone?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. A capacity discussion needs measured behavior, an operating profile, installation topology, and a defined acceptance objective.<\/p>\n<h3 style=\"margin:28px 0 12px\">\u0413\u0430\u0440\u0430\u043d\u0442\u0438\u0440\u0443\u0435\u0442 \u043b\u0438 \u044d\u0442\u0430 \u0441\u0442\u0430\u0442\u044c\u044f \u0441\u043e\u0431\u043b\u044e\u0434\u0435\u043d\u0438\u0435 \u0442\u0440\u0435\u0431\u043e\u0432\u0430\u043d\u0438\u0439 \u0438\u043b\u0438 \u043e\u043f\u0435\u0440\u0430\u0446\u0438\u043e\u043d\u043d\u044b\u0439 \u0440\u0435\u0437\u0443\u043b\u044c\u0442\u0430\u0442?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">No. Site conditions, standards application, acceptance criteria, and commissioning must be confirmed for the specific project.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">\u0421\u0441\u044b\u043b\u043a\u0438<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 \u041a\u043e\u043d\u0442\u0440\u043e\u043b\u044c \u0433\u0430\u0440\u043c\u043e\u043d\u0438\u043a \u0432 \u044d\u043b\u0435\u043a\u0442\u0440\u0438\u0447\u0435\u0441\u043a\u0438\u0445 \u0441\u0438\u0441\u0442\u0435\u043c\u0430\u0445<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nfpa.org\/codes-and-standards\/nfpa-70-standard-development\/70\" rel=\"nofollow noopener\" target=\"_blank\">NFPA 70 \u2014 National Electrical Code information<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\/view\/motors-and-generators\" rel=\"nofollow noopener\" target=\"_blank\">NEMA MG 1 \u2014 \u0414\u0432\u0438\u0433\u0430\u0442\u0435\u043b\u0438 \u0438 \u0433\u0435\u043d\u0435\u0440\u0430\u0442\u043e\u0440\u044b<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Oem panel integration interfaces for apf and svg equipment should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate, or a single switching event does not by itself establish the cause, the required equipment, or the acceptance criteria. Contents Part 1. Define the decision boundary [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":1917,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2222","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/posts\/2222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/comments?post=2222"}],"version-history":[{"count":3,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/posts\/2222\/revisions"}],"predecessor-version":[{"id":2303,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/posts\/2222\/revisions\/2303"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/media\/1917"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/media?parent=2222"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/categories?post=2222"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/ru\/wp-json\/wp\/v2\/tags?post=2222"}],"curies":[{"name":"\u0432\u043f","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}