{"id":3250,"date":"2026-10-09T09:00:00","date_gmt":"2026-10-09T01:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=3250"},"modified":"2026-10-08T22:02:49","modified_gmt":"2026-10-08T14:02:49","slug":"circular-vs-linear-capacitor-switching","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/th\/blog\/circular-vs-linear-capacitor-switching\/","title":{"rendered":"\u0e01\u0e32\u0e23\u0e2a\u0e31\u0e1a\u0e40\u0e1b\u0e25\u0e35\u0e48\u0e22\u0e19\u0e41\u0e1a\u0e07\u0e01\u0e4c\u0e04\u0e32\u0e1b\u0e32\u0e0b\u0e34\u0e40\u0e15\u0e2d\u0e23\u0e4c\u0e41\u0e1a\u0e1a\u0e27\u0e07\u0e01\u0e25\u0e21\u0e01\u0e31\u0e1a\u0e41\u0e1a\u0e1a\u0e40\u0e2a\u0e49\u0e19\u0e15\u0e23\u0e07"},"content":{"rendered":"<p>Circular versus linear capacitor switching describes how a power factor controller chooses the next eligible capacitor stage, rather than how quickly a switch closes. Linear operation commonly follows a fixed stage order; circular operation rotates the duty among interchangeable stages. Rotation can distribute operations more evenly, but only when the stages have compatible ratings and the controller explicitly supports that arrangement. Neither mode overrides discharge time, protection, or the required reactive power. Choose the sequence from the actual stage layout, load behavior, and controller manual, then verify the result with recorded stage operations instead of assuming that a menu name guarantees correct performance.<\/p>\n<h2>What the two sequence names mean<\/h2>\n<p>A fixed sequence makes the relationship between output number and stage order easy to follow. An installation may bring in the first available stage, then the next stage, as reactive demand increases. When demand falls, the controller removes stages according to its documented algorithm. Some controllers use a reverse removal order, while others implement their own selection rules. The word linear alone does not establish the removal sequence, so an acceptance test must cover both rising and falling demand.<\/p>\n<p>Circular switching rotates the starting point or the next selected output across a group of suitable stages. If three identical stages satisfy the same demand, the controller can alternate which one performs that duty. The aim is to avoid always assigning the earliest operations to one physical stage. Controllers may call this rotational, cyclic, or equal-duty operation. Those labels are useful clues, but the operating instructions determine whether the function rotates by order, elapsed operation, or another criterion.<\/p>\n<p>The <a href=\"https:\/\/cnbygele.com\/product\/jkw-series-reactive-power-automatic-compensation-controller\/\">CNBYG JKW-series reactive power controller<\/a> is a relevant physical controller reference. Its appearance does not prove that every variant offers either sequence. Obtain the manual and ordering specification for the installed model before promising a particular algorithm. The discussion below concerns a commissioning method, not undocumented firmware capabilities.<\/p>\n<p><figure><img decoding=\"async\" alt=\"Circular vs Linear Capacitor Bank Switching \u2014 unpowered exterior inspection\" class=\"wp-image-3248\" height=\"1024\" loading=\"lazy\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008.png\" style=\"max-width:100%;height:auto\" width=\"1536\" srcset=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008.png 1536w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008-300x200.png 300w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008-1024x683.png 1024w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008-768x512.png 768w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008-18x12.png 18w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-inspection-20261008-600x400.png 600w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Product-reference illustration. Equipment is unpowered; this is not a photograph of a live test.<\/figcaption><\/figure>\n<\/p>\n<h2>Separate selection order from switching hardware<\/h2>\n<p>The controller issues a request; the switching device connects or disconnects the capacitor branch. A contactor, composite switch, or appropriately specified semiconductor switch has its own operating limits. Changing the controller sequence does not change those limits or make a mechanical contactor suitable for rapid cycling.<\/p>\n<p>Similarly, a circular sequence does not mean that several charged capacitors may be reconnected immediately. An unavailable stage must remain unavailable until its specified discharge and reconnection conditions have been satisfied. If the controller cannot track those conditions individually, the system designer must provide an appropriate arrangement. Read the related <a href=\"https:\/\/cnbygele.com\/blog\/capacitor-switching-delay-setting\/\">capacitor switching delay guide<\/a> before adjusting sequence settings.<\/p>\n<p>A useful way to discuss the system is to separate three decisions: how much reactive power is needed, which stage combination supplies it, and which eligible physical stage supplies each interchangeable portion. Sequence is primarily the third decision. Confusing these decisions can produce a bank that alternates outputs neatly while still overcompensating the load.<\/p>\n<h2>Match the sequence to the stage ratings<\/h2>\n<p>Equal-sized stages are the simplest case for rotation. When each stage supplies approximately the same usable reactive power under the operating conditions, substitution has little effect on the total commanded compensation. The controller still needs to exclude a stage that is isolated, alarmed, or waiting for discharge. Stage age and measured performance also matter: two nominally identical units may no longer supply equal output.<\/p>\n<p>Unequal stages require additional care. A fixed sequence can represent a designed progression, but it may miss useful intermediate combinations if the algorithm simply adds outputs in numerical order. A controller with intelligent combination selection may support unequal ratings without relying on a fixed progression. That is a separate capability and should be verified directly. Do not rotate a small trimming stage with a large bulk stage merely because both are connected to output relays.<\/p>\n<p>The <a href=\"https:\/\/cnbygele.com\/blog\/apfc-controller-step-selection\/\">controller step selection guide<\/a> explains the distinction between the number of available outputs and the compensation resolution. Use that distinction here: twelve outputs do not necessarily represent twelve equal stages, and an unused output is not an eligible capacitor branch.<\/p>\n<h2>A comparison table for commissioning decisions<\/h2>\n<p>The following table is a qualitative engineering checklist, not a statement of features available on any specific CNBYG controller. Electrical work and testing must follow the installed equipment instructions and the isolation requirements described by <a href=\"https:\/\/www.hse.gov.uk\/electricity\/faq.htm\" rel=\"noopener nofollow\" target=\"_blank\">HSE electrical safety guidance<\/a>.<\/p>\n<div style=\"overflow-x:auto;max-width:100%\">\n<table style=\"border-collapse:collapse;min-width:560px;width:100%\">\n<thead>\n<tr>\n<th style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Decision<\/th>\n<th style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Fixed or linear sequence<\/th>\n<th style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Circular or rotational sequence<\/th>\n<th style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Evidence to obtain<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Equal stage group<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Easy to associate outputs with a fixed order<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Can distribute selection across compatible stages<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Actual stage ratings and algorithm description<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Unequal stage group<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">May suit a defined progression if combinations are adequate<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Requires grouping or an algorithm that respects unequal ratings<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Supported stage ratios and test results<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Unavailable stage<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Must skip or inhibit the affected output correctly<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Must remove the affected stage from the rotation<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Isolation and alarm behavior in the manual<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Reconnection delay<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Required independently of order<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Required independently of rotation<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Stage eligibility and discharge requirements<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Maintenance records<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Fixed early stages may accumulate more operations<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Operation counts may become more balanced<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Recorded counts rather than assumptions<\/td>\n<\/tr>\n<tr>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Small load changes<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Depends on step size and deadband<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Depends on step size and deadband<\/td>\n<td style=\"padding:10px;border:1px solid #d1d5db;text-align:left;vertical-align:top\">Trend of load, reactive power, and stage commands<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Build a stage eligibility list first<\/h2>\n<p>Before modifying the algorithm, make a written list of outputs and connected branches. Record the capacitor rating, reactor pairing where applicable, switching device, protective device, and whether the stage is enabled. Identify equal-stage groups separately from special trimming stages. Use the approved panel drawings rather than inferring connections from the controller face.<\/p>\n<p>Add the reasons a stage cannot be selected: manual isolation, protective trip, thermal alarm, discharge waiting time, disabled output, or a known capacity fault. Check whether the controller detects each condition or whether another circuit inhibits operation. A screen that displays an output as on may only show its command; it may not confirm that the branch actually carries current.<\/p>\n<p>This list gives technicians a consistent vocabulary during commissioning. A stage can be installed, enabled, available, commanded, and confirmed as supplying reactive power; these are different states. Recording them separately makes it easier to identify a selection problem without repeatedly changing unrelated settings.<\/p>\n<h2>Test a fixed sequence before testing rotation<\/h2>\n<p>Start with the site-approved settings and a controlled load condition. Observe the measured power factor and reactive power, then record the command sequence as demand increases. Confirm that the expected branch responds to each output. Repeat the observation as demand decreases. Do not create artificial faults on energized equipment to discover how a controller behaves.<\/p>\n<p>Next, investigate any mismatch between command and branch response. A wiring error, blown protective device, failed contactor, or degraded capacitor can make a correct algorithm appear ineffective. Fix those conditions before comparing modes. Also verify the measurement arrangement; the <a href=\"https:\/\/cnbygele.com\/blog\/apfc-controller-ct-ratio-setup\/\">CT ratio setup guide<\/a> is a separate resource for measurement settings that should not be confused with sequence selection.<\/p>\n<p>After the fixed mode behaves correctly, test a documented rotational mode with a suitable equal-stage group. Record several repeated demand cycles. Confirm that stage substitution changes the selected physical branch without introducing excessive compensation or reconnection before eligibility. If results are ambiguous, retain the proven configuration while obtaining clarification from the controller supplier.<\/p>\n<h2>Compare wear using records, not impressions<\/h2>\n<p>Rotation can spread the number of switching operations, but operation count is only one contributor to component condition. Temperature, harmonics, switching transients, contact condition, and branch loading also affect life. Equal counts cannot establish equal remaining service life, and this article does not promise a numerical lifetime improvement from rotation.<\/p>\n<p>Collect a baseline before changing the setting. Note stage operation counts if available, operating hours, alarms, and maintenance findings. Repeat the observation over a comparable load period. A shift change or production shutdown can change the apparent distribution, so compare similar operating conditions. Where counts are unavailable, a reviewed event log can still reveal whether one branch is always selected first.<\/p>\n<p>The <a href=\"https:\/\/www.energy.gov\/eere\/amo\/motor-systems\" rel=\"noopener nofollow\" target=\"_blank\">US Department of Energy motor systems resources<\/a> provide broader industrial efficiency context. Power factor compensation should remain part of a measured system assessment, with the actual load and tariff considered, rather than being judged solely by a controller&#8217;s displayed target.<\/p>\n<p><figure><img decoding=\"async\" alt=\"Circular vs Linear Capacitor Bank Switching \u2014 operation and maintenance records\" class=\"wp-image-3249\" height=\"1024\" loading=\"lazy\" src=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008.png\" style=\"max-width:100%;height:auto\" width=\"1536\" srcset=\"https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008.png 1536w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008-300x200.png 300w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008-1024x683.png 1024w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008-768x512.png 768w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008-18x12.png 18w, https:\/\/cnbygele.com\/wp-content\/uploads\/2026\/10\/circular-vs-linear-capacitor-switching-records-20261008-600x400.png 600w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><figcaption>Product-reference illustration. Equipment is unpowered; this is not a photograph of a live test.<\/figcaption><\/figure>\n<\/p>\n<h2>Prevent hunting while evaluating a new sequence<\/h2>\n<p>A load that fluctuates close to a switching threshold may cause repeated insertion and removal. Rotation can move those operations between branches without removing the underlying cause. Review compensation step size, measurement stability, deadband, and delay together. Change one relevant parameter at a time so the effects remain understandable.<\/p>\n<p>An oversized smallest stage may overcompensate a lightly loaded installation whichever sequence is selected. Likewise, a measurement point that omits some loads can produce misleading demand. These conditions require engineering correction rather than a different order of outputs. The separate <a href=\"https:\/\/cnbygele.com\/blog\/prevent-capacitor-stage-hunting\/\">stage hunting troubleshooting guide<\/a> covers that diagnosis in greater detail.<\/p>\n<p>Keep the distinction between response and stability explicit. A slow sequence may miss a changing load; a fast sequence may exceed switching equipment limits. The suitable compromise depends on the actual installation. Do not copy generic delay values from another panel or shorten discharge waiting time to make a rotation demonstration look smoother.<\/p>\n<h2>Document the accepted mode and its limits<\/h2>\n<p>The handover record should name the controller model, firmware if available, selected mode, equal-stage groups, excluded outputs, and the procedure used to verify operation. Include the date, approved settings, and who authorized the change. Attach the stage inventory and any supplier explanation of algorithm behavior.<\/p>\n<p>Record what was not tested as well as what passed. For example, observing three normal load cycles does not prove operation under a thermal alarm, reverse power flow, or generator supply. These states need their own reviewed test procedure when relevant. The acceptance record should not imply protection functions that were only discussed.<\/p>\n<p>A maintainable installation lets the next technician understand why a stage was chosen and when it may reconnect. If the terminology in the menu is unclear, retain a verified arrangement and resolve the uncertainty from authoritative equipment documentation. A sequence setting is successful when measured compensation, switching limits, and protection remain correct together.<\/p>\n<h2>Further learning: power factor fundamentals<\/h2>\n<p>This NPTEL lecture explains the electrical quantities behind compensation demand. It supports the distinction between reactive power and sequence selection; it is not a programming tutorial for a CNBYG controller.<\/p>\n<div style=\"position:relative;padding-bottom:56.25%;height:0;overflow:hidden\"><iframe allowfullscreen=\"\" loading=\"lazy\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/7S22cJ_aF9M\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;border:0\" title=\"Lecture - 15 Power Factor by NPTEL\"><\/iframe><\/div>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=7S22cJ_aF9M\" rel=\"noopener nofollow\" target=\"_blank\">Watch Lecture &#8211; 15 Power Factor by NPTEL<\/a><\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>Does circular switching always improve capacitor life?<\/h3>\n<p>No. It can distribute operations among compatible stages, but temperature, harmonics, switching transients, component condition, and loading still determine service requirements. Verify operation counts and condition rather than promising a fixed lifetime gain.<\/p>\n<h3>Can unequal capacitor stages be rotated?<\/h3>\n<p>Only if the documented algorithm respects the stage ratings and valid combinations. Do not treat a small trimming stage as interchangeable with a large stage. Check supported ratios and verify actual compensation through controlled observations.<\/p>\n<h3>Is circular switching the same as fast switching?<\/h3>\n<p>No. Circular describes selection order or duty distribution. Switching speed and reconnection limits belong to the controller timing, discharge arrangement, and switching device specification, and remain applicable in every mode.<\/p>\n<h3>Should switching order be changed to cure stage hunting?<\/h3>\n<p>Investigate the cause first. Rotation can spread repeated operations without eliminating unstable measurements, oversized steps, or inappropriate thresholds. Review those conditions and retain the required discharge and protection limits.<\/p>\n<p><script type=\"application\/ld+json\">{\"@context\": \"https:\/\/schema.org\", \"@type\": \"FAQPage\", \"mainEntity\": [{\"@type\": \"Question\", \"name\": \"Does circular switching always improve capacitor life?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. It can distribute operations among compatible stages, but temperature, harmonics, switching transients, component condition, and loading still determine service requirements. Verify operation counts and condition rather than promising a fixed lifetime gain.\"}}, {\"@type\": \"Question\", \"name\": \"Can unequal capacitor stages be rotated?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Only if the documented algorithm respects the stage ratings and valid combinations. Do not treat a small trimming stage as interchangeable with a large stage. Check supported ratios and verify actual compensation through controlled observations.\"}}, {\"@type\": \"Question\", \"name\": \"Is circular switching the same as fast switching?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"No. Circular describes selection order or duty distribution. Switching speed and reconnection limits belong to the controller timing, discharge arrangement, and switching device specification, and remain applicable in every mode.\"}}, {\"@type\": \"Question\", \"name\": \"Should switching order be changed to cure stage hunting?\", \"acceptedAnswer\": {\"@type\": \"Answer\", \"text\": \"Investigate the cause first. Rotation can spread repeated operations without eliminating unstable measurements, oversized steps, or inappropriate thresholds. Review those conditions and retain the required discharge and protection limits.\"}}]}<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0e40\u0e1b\u0e23\u0e35\u0e22\u0e1a\u0e40\u0e17\u0e35\u0e22\u0e1a\u0e01\u0e32\u0e23\u0e2a\u0e25\u0e31\u0e1a\u0e01\u0e32\u0e23\u0e17\u0e33\u0e07\u0e32\u0e19\u0e02\u0e2d\u0e07\u0e15\u0e31\u0e27\u0e40\u0e01\u0e47\u0e1a\u0e1b\u0e23\u0e30\u0e08\u0e38\u0e41\u0e1a\u0e1a\u0e27\u0e07\u0e01\u0e25\u0e21\u0e41\u0e25\u0e30\u0e41\u0e1a\u0e1a\u0e40\u0e0a\u0e34\u0e07\u0e40\u0e2a\u0e49\u0e19 \u0e15\u0e23\u0e27\u0e08\u0e2a\u0e2d\u0e1a\u0e02\u0e31\u0e49\u0e19\u0e01\u0e32\u0e23\u0e17\u0e33\u0e07\u0e32\u0e19\u0e17\u0e35\u0e48\u0e2a\u0e32\u0e21\u0e32\u0e23\u0e16\u0e2a\u0e31\u0e1a\u0e40\u0e1b\u0e25\u0e35\u0e48\u0e22\u0e19\u0e01\u0e31\u0e19\u0e44\u0e14\u0e49 \u0e22\u0e37\u0e19\u0e22\u0e31\u0e19\u0e04\u0e38\u0e13\u0e2a\u0e21\u0e1a\u0e31\u0e15\u0e34\u0e01\u0e32\u0e23\u0e04\u0e32\u0e22\u0e1b\u0e23\u0e30\u0e08\u0e38 \u0e41\u0e25\u0e30\u0e1a\u0e31\u0e19\u0e17\u0e36\u0e01\u0e01\u0e32\u0e23\u0e17\u0e33\u0e07\u0e32\u0e19\u0e02\u0e2d\u0e07\u0e23\u0e30\u0e1a\u0e1a APFC \u0e42\u0e14\u0e22\u0e44\u0e21\u0e48\u0e2a\u0e31\u0e1a\u0e2a\u0e19\u0e23\u0e30\u0e2b\u0e27\u0e48\u0e32\u0e07\u0e25\u0e33\u0e14\u0e31\u0e1a\u0e01\u0e32\u0e23\u0e17\u0e33\u0e07\u0e32\u0e19\u0e01\u0e31\u0e1a\u0e04\u0e27\u0e32\u0e21\u0e40\u0e23\u0e47\u0e27.<\/p>","protected":false},"author":4,"featured_media":3247,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[231],"class_list":["post-3250","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-power-factor-correction"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/posts\/3250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/comments?post=3250"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/posts\/3250\/revisions"}],"predecessor-version":[{"id":3251,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/posts\/3250\/revisions\/3251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/media\/3247"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/media?parent=3250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/categories?post=3250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/th\/wp-json\/wp\/v2\/tags?post=3250"}],"curies":[{"name":"\u0e14\u0e35\u0e21\u0e32\u0e01","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}