{"id":2566,"date":"2026-07-21T09:00:00","date_gmt":"2026-07-21T01:00:00","guid":{"rendered":"https:\/\/cnbygele.com\/?p=2566"},"modified":"2026-08-24T18:09:44","modified_gmt":"2026-08-24T10:09:44","slug":"power-quality-metering-before-apf-svg-rfq","status":"publish","type":"post","link":"https:\/\/cnbygele.com\/tr\/blog\/power-quality-metering-before-apf-svg-rfq\/","title":{"rendered":"Power Quality Metering: What to Log Before an APF RFQ"},"content":{"rendered":"<div class=\"b2b-article\">\n<p style=\"margin:0 0 16px;line-height:1.7\"><strong>Power quality metering is the evidence base for any APF or SVG inquiry.<\/strong> Before a mitigation RFQ is issued, the site team should log where each measurement was taken, which operating states were covered, how long the meter ran, and what the harmonic spectrum and reactive-power trend looked like at the point of common coupling. A supplier can only discuss equipment fit against that record, not against a single snapshot reading.<\/p>\n<nav class=\"b2b-toc\" style=\"background:#f5f8fa;padding:16px 20px;border-radius:8px;margin:0 0 24px\">\n<h2 id=\"contents\" style=\"margin:42px 0 14px;scroll-margin-top:96px\">\u0130\u00e7indekiler<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"#define-the-electrical-boundary-before-collecting-data\">Veri toplamadan \u00f6nce elektriksel s\u0131n\u0131r\u0131 tan\u0131mlay\u0131n<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#separate-harmonic-planning-from-other-electrical-questions\">Armonik planlamay\u0131 di\u011fer elektrik sorular\u0131ndan ay\u0131r\u0131n<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#compare-mitigation-paths-without-defaulting-to-one-device\">Tek bir cihaza ba\u011fl\u0131 kalmadan azalt\u0131m yollar\u0131n\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#plan-integration-and-commissioning-early\">Entegrasyon ve devreye almay\u0131 erken planlay\u0131n<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"#rfq-checklist-and-fit-boundary\">RFQ kontrol listesi ve uyum s\u0131n\u0131r\u0131<\/a><\/li>\n<\/ul>\n<\/nav>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"direct-answer\">Do\u011frudan cevap<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Power quality metering is the evidence base for any APF or SVG inquiry. Before a mitigation RFQ is issued, the site team should log where each measurement was taken, which operating states were covered, how long the meter ran, and what the harmonic spectrum and reactive-power trend looked like at the point of common coupling. A supplier can only discuss equipment fit against that record, not against a single snapshot reading.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">This matters because harmonic-current questions, reactive-power questions, voltage events, protection coordination, and equipment-operation questions can overlap without having the same technical answer. CNBYG can discuss AHF\/APF product-line context when measured harmonic current is the defined objective. It cannot establish a compliance verdict, a specific measurement outcome, or a guaranteed harmonic result from an article or a nameplate rating. For wider navigation, use the <a href=\"https:\/\/cnbygele.com\/tr\/power-quality-system-guides\/\">G\u00fc\u00e7 Kalitesi Sistem M\u00fchendisli\u011fi K\u0131lavuzlar\u0131<\/a>.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"define-the-electrical-boundary-before-collecting-data\">Veri toplamadan \u00f6nce elektriksel s\u0131n\u0131r\u0131 tan\u0131mlay\u0131n<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u0130lk karar, sonucun nerede kullan\u0131laca\u011f\u0131d\u0131r. M\u00fcnferit bir besleyicideki \u00f6l\u00e7\u00fcm, yerel bir y\u00fck\u00fcn karakterize edilmesine yard\u0131mc\u0131 olabilir. Bir hizmet giri\u015findeki, trafo ikincil taraf\u0131ndaki veya ortak ba\u011flant\u0131 noktas\u0131ndaki bir \u00f6l\u00e7\u00fcm ise farkl\u0131 bir soruyu yan\u0131tlar. Saya\u00e7 konumunu, ak\u0131m trafosu (CT) y\u00f6nelimini, voltaj referans\u0131n\u0131, \u00f6rnekleme aral\u0131\u011f\u0131n\u0131, toplula\u015ft\u0131rma periyodunu, \u00e7al\u0131\u015fma durumunu ve di\u011fer b\u00fcy\u00fck y\u00fcklerin aktif olup olmad\u0131\u011f\u0131n\u0131 kaydedin. Bu ayr\u0131nt\u0131lar olmadan, bir say\u0131, bir proje hedefiyle g\u00fcvenilir bir \u015fekilde kar\u015f\u0131la\u015ft\u0131r\u0131lamaz.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">For a pre-RFQ metering campaign, create an operating log that identifies normal production or occupancy schedules, start-up sequences, idle periods, maintenance states, and coincident loads. The log should make clear when the monitored load is active and what else is connected to the same bus. Log at least one full operating cycle so the RFQ record covers minimum, typical, and peak windows rather than a single afternoon.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Yararl\u0131 bir RFQ \u00f6ncesi \u00f6l\u00e7\u00fcm kayd\u0131 normalde \u015fu \u00f6\u011feleri kapsar:<\/p>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\">CT oran\u0131 ve polaritesi belirtilmi\u015f \u015fekilde her bir saya\u00e7 i\u00e7in tek hat \u015femas\u0131 konumu.<\/li>\n<li style=\"margin:0 0 8px\">Tek bir anl\u0131k g\u00f6r\u00fcnt\u00fc olarak de\u011fil, tan\u0131mlanm\u0131\u015f toplula\u015ft\u0131rma aral\u0131klar\u0131nda yakalanan voltaj ve ak\u0131m spektrumlar\u0131.<\/li>\n<li style=\"margin:0 0 8px\">A time-stamped operating log linking each measurement window to the logged operating state.<\/li>\n<li style=\"margin:0 0 8px\">Ayn\u0131 baradaki mevcut kondansat\u00f6r, reakt\u00f6r, filtre ve s\u00fcr\u00fcc\u00fc envanteri.<\/li>\n<li style=\"margin:0 0 8px\">En az bir tipik \u00e7al\u0131\u015fma d\u00f6ng\u00fcs\u00fc boyunca g\u00fc\u00e7 ve reaktif g\u00fc\u00e7 e\u011filimi.<br \/>\n| Measurement question | Useful project input | Decision it supports |<br \/>\n|&#8212;|&#8212;|&#8212;|<br \/>\n| What is occurring at the metered feeder or bus? | Current spectrum, RMS trend, load state, CT location | Local troubleshooting and source characterization |<br \/>\n| What is occurring at the system boundary? | Voltage\/current trends, demand, transformer and upstream data | System-level assessment and target definition |<br \/>\n| Is the condition repeatable across operating weeks? | Time-stamped operating log and multiple representative periods | Capacity and commissioning planning |<br \/>\n| What equipment is already connected? | Single-line, capacitor\/reactor\/filter and protection details | Interaction and integration review |<\/li>\n<\/ul>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"separate-harmonic-planning-from-other-electrical-questions\">Armonik planlamay\u0131 di\u011fer elektrik sorular\u0131ndan ay\u0131r\u0131n<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Harmonik planlama, her operasyonel sorun i\u00e7in her derde deva bir a\u00e7\u0131klama haline gelmemelidir. Bir dalga formu okumas\u0131, voltaj de\u011fi\u015fiminin, reaktif g\u00fc\u00e7 talebinin, dengesizli\u011fin, anahtarlama olaylar\u0131n\u0131n veya \u015febeke \u00fcst ak\u0131m bozulmas\u0131n\u0131n yan\u0131nda mevcut olabilir. Her sorunun kendi kan\u0131t\u0131na ve kabul y\u00f6ntemine ihtiyac\u0131 vard\u0131r. Bu ayr\u0131m yap\u0131lmadan \u00f6nce yap\u0131lan bir tavsiye, \u00f6zellikle tesisin mevcut kompanzasyon ekipman\u0131 veya birden fazla do\u011frusal olmayan ak\u0131m kayna\u011f\u0131 i\u00e7erdi\u011fi durumlarda yanl\u0131\u015f bir kapsama alan\u0131 olu\u015fturabilir.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">The <a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 standard\u0131na genel bak\u0131\u015f<\/a> Sistem s\u0131n\u0131rlar\u0131ndaki harmonik kontrol\u00fcn\u00fc tart\u0131\u015fmak i\u00e7in yararl\u0131 bir ba\u011flam sunar, ancak evrensel bir cihaz boyutland\u0131rma kural\u0131 de\u011fildir. Proje ekipleri ge\u00e7erli noktay\u0131, veri setini, \u015febeke ko\u015fullar\u0131n\u0131 ve s\u00f6zle\u015fmesel gereklili\u011fi belirlemelidir. Benzer \u015fekilde, bir makale \u00f6l\u00e7\u00fclen durumun belirli bir operasyonel olaya neden oldu\u011funu do\u011frulayamaz. Bu ili\u015fkiyi kurmak i\u00e7in saha \u00f6l\u00e7\u00fcmlerini ve sorumlu m\u00fchendislik s\u00fcrecini kullan\u0131n.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"compare-mitigation-paths-without-defaulting-to-one-device\">Tek bir cihaza ba\u011fl\u0131 kalmadan azalt\u0131m yollar\u0131n\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Azalt\u0131m yolu, belirlenen hedefi takip eder. Bir se\u00e7enek, yaln\u0131zca \u00f6l\u00e7\u00fcm kayd\u0131 bunu destekledi\u011finde ve entegrasyon tasar\u0131m\u0131 anla\u015f\u0131ld\u0131\u011f\u0131nda k\u0131sa listeye al\u0131nmal\u0131d\u0131r. Hi\u00e7bir tekil cihaz, herhangi bir bozulma okumas\u0131, reaktif g\u00fc\u00e7 hedefi, gerilim olay\u0131 veya sistem \u00e7al\u0131\u015fmas\u0131 bulgusu i\u00e7in otomatik olarak do\u011fru yan\u0131t de\u011fildir. Mevcut kondansat\u00f6r bankalar\u0131, reakt\u00f6rler, filtreler, s\u00fcr\u00fcc\u00fcler, trafo empedans\u0131, koruma ve beklenen y\u00fck de\u011fi\u015fimi proje incelemesinin tamam\u0131n\u0131 etkiler.<\/p>\n<table style=\"width:100%;border-collapse:collapse\">\n<thead>\n<tr>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Se\u00e7enek kategorisi<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Dikkate al\u0131nabilir<\/th>\n<th style=\"border:1px solid #d9e1e8;padding:9px 12px;background:#f5f8fa;text-align:left\">Se\u00e7imden \u00f6nce onaylanmal\u0131d\u0131r<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">AHF \/ APF<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Harmonic-current mitigation at the assessed PCC or bus is a defined, measured objective<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Mevcut profil, montaj yeri, AK plan\u0131, kapasite esas\u0131, koruma, \u0131s\u0131 ve kabul y\u00f6ntemi<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">SVG \/ ASVG<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Dinamik reaktif g\u00fc\u00e7 davran\u0131\u015f\u0131 birincil tan\u0131mlanm\u0131\u015f hedeftir<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Reaktif g\u00fc\u00e7 profili, gerilim ba\u011flam\u0131, mevcut ekipman, kontroller ve devreye alma s\u0131n\u0131r\u0131<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Pasif bile\u015fenler<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Sistem \u00e7al\u0131\u015fmas\u0131 uygun bir sabit veya ayarlanm\u0131\u015f fonksiyon tan\u0131mlar<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Rezonans riski, anahtarlama, \u015febeke verileri, koruma ve fiziksel kurulum<\/td>\n<\/tr>\n<tr>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Operasyonel veya yukar\u0131 ak\u0131\u015f de\u011fi\u015fikli\u011fi<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Kaynak, takvim veya da\u011f\u0131t\u0131m yap\u0131land\u0131rmas\u0131 \u00f6nem arz etmektedir<\/td>\n<td style=\"border:1px solid #d9e1e8;padding:9px 12px\">Mal sahibi sorumluluklar\u0131, altyap\u0131 koordinasyonu ve belgelendirilmi\u015f uygulama yolu<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin:0 0 16px;line-height:1.7\">\u00dcr\u00fcn grubu tart\u0131\u015fmas\u0131 i\u00e7in bkz. <a href=\"https:\/\/cnbygele.com\/tr\/product\/ahf-active-harmonic-filter-harmonic-control\/\">CNBYG AHF Aktif Harmonik Filtre sayfas\u0131<\/a>. Proje verileriyle birlikte kullan\u0131lmal\u0131, \u00e7al\u0131\u015fman\u0131n yerini almamal\u0131d\u0131r. \u0130lgili k\u0131lavuz <a href=\"https:\/\/cnbygele.com\/tr\/blog\/vfd-harmonics-industrial-plants-apf-selection\/\">S\u00fcr\u00fcc\u00fc (VFD) harmonik \u00f6l\u00e7\u00fcm\u00fc ve APF se\u00e7imi<\/a> kom\u015fu bir uygulama ba\u011flam\u0131nda ayn\u0131 \u00f6l\u00e7\u00fcm odakl\u0131 yakla\u015f\u0131m\u0131 a\u00e7\u0131klar.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"plan-integration-and-commissioning-early\">Entegrasyon ve devreye almay\u0131 erken planlay\u0131n<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Entegrasyon sorular\u0131, bir RFQ yay\u0131nlanmadan \u00f6nce belirlenmelidir. Ekip; \u00f6nerilen ba\u011flant\u0131 konumunu, ak\u0131m trafosu (CT) d\u00fczenini, fider ve bara konfig\u00fcrasyonunu, mevcut alan\u0131, kablo g\u00fczergah\u0131n\u0131, havaland\u0131rmay\u0131, \u00e7evresel ko\u015fullar\u0131, eri\u015fimi, ileti\u015fimi, alarmlar\u0131 ve bak\u0131m beklentilerini belgelendirmelidir. Koruma koordinasyonu ve devre d\u0131\u015f\u0131 b\u0131rakma (enerji kesme) gereksinimleri de projeye \u00f6zel bir inceleme gerektirir. bunlar ekipman gelene kadar ertelenecek detaylar de\u011fil, tasar\u0131m girdileridir.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">Devreye alma, temsili montaj sonras\u0131 ko\u015fullar\u0131, \u00f6nceden \u00fczerinde anla\u015fmaya var\u0131lm\u0131\u015f referans durum (baz \u00e7izgisi) ve belirlenen kabul y\u00f6ntemi ile kar\u015f\u0131la\u015ft\u0131rmal\u0131d\u0131r. \u00c7al\u0131\u015fma ko\u015fulunu benzer tutun: hangi b\u00fcy\u00fck y\u00fcklerin \u00e7al\u0131\u015fmakta oldu\u011funu, saya\u00e7lar\u0131n nereye ba\u011fland\u0131\u011f\u0131n\u0131 ve hangi \u00f6l\u00e7\u00fcm ayarlar\u0131n\u0131n kullan\u0131ld\u0131\u011f\u0131n\u0131 kaydedin. Sahan\u0131n hedefleri bir sistem s\u0131n\u0131r\u0131 metri\u011fini i\u00e7eriyorsa, \u00f6l\u00e7\u00fcm plan\u0131 bu s\u0131n\u0131r\u0131 korumal\u0131d\u0131r. Farkl\u0131 bir saya\u00e7 konumu veya farkl\u0131 bir y\u00fck durumu, ekipman performans\u0131ndaki bir de\u011fi\u015fikli\u011fi g\u00f6stermeksizin farkl\u0131 bir sonu\u00e7 \u00fcretebilir. K\u0131lavuz, <a href=\"https:\/\/cnbygele.com\/tr\/blog\/ieee-519-harmonic-limits-apf-sizing\/\">IEEE 519 harmonik s\u0131n\u0131rlar\u0131 ve APF boyutland\u0131rma<\/a> ayn\u0131 devreye alma disiplininin ilgili bir senaryoda nas\u0131l ge\u00e7erli oldu\u011funu g\u00f6sterir.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"rfq-checklist-and-fit-boundary\">RFQ kontrol listesi ve uyum s\u0131n\u0131r\u0131<\/h2>\n<p style=\"margin:0 0 16px;line-height:1.7\">Bir sorgu, tek hat \u015femas\u0131, nominal gerilim ve frekans, transformat\u00f6r bilgileri, temsili gerilim\/ak\u0131m verileri, \u00e7al\u0131\u015fma program\u0131, y\u00fck envanteri, mevcut kondansat\u00f6rler\/reakt\u00f6rler\/filtreler, koruma bilgileri, \u00f6nerilen kurulum noktas\u0131, alan ve so\u011futma verileri ile ileti\u015fim gereksinimlerini i\u00e7erdi\u011finde daha yararl\u0131 olur. Gerekli karar\u0131 a\u00e7\u0131klay\u0131n: yerel ar\u0131za giderme, sistem s\u0131n\u0131r\u0131 de\u011ferlendirmesi, harmonik ak\u0131m azaltma, reaktif g\u00fc\u00e7 m\u00fcdahalesi veya koordineli inceleme.<\/p>\n<p style=\"margin:0 0 16px;line-height:1.7\">CNBYG can review these inputs and discuss whether its product line fits the stated scope. It should not be asked to promise a compliance verdict, a specific measurement outcome, or a guaranteed harmonic result. Where a project has regulated, critical, or unusual operating constraints, involve the relevant owner, system engineer, utility, and equipment specialists. Use the <a href=\"https:\/\/cnbygele.com\/tr\/contact-us\/\">CNBYG ileti\u015fim sayfas\u0131<\/a> mevcut proje bilgilerini sunmak i\u00e7in.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"frequently-asked-questions\">S\u0131k sorulan sorular<\/h2>\n<h3 style=\"margin:28px 0 12px\">How long should power quality metering run before an APF or SVG RFQ?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Long enough to capture representative operating states. Many industrial campaigns log at least one full production week, and longer where seasonal or scheduled loads change the demand profile.<\/p>\n<h3 style=\"margin:28px 0 12px\">Should harmonics be logged at the PCC or at individual feeders?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Both locations answer different questions. Feeder data characterizes a source, while PCC data supports a system-boundary discussion, so each record must be labeled with its position.<\/p>\n<h3 style=\"margin:28px 0 12px\">Which load events should appear in the metering record?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Start-up sequences, shutdowns, coincident peaks, capacitor switching, and any abnormal events, each linked to a time-stamped operating note.<\/p>\n<h3 style=\"margin:28px 0 12px\">Risk azaltma ekipman\u0131n\u0131 se\u00e7mek i\u00e7in tek bir \u00f6l\u00e7\u00fcm yeterli midir?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Genellikle hay\u0131r. Verilerin temsil edici olup olmad\u0131\u011f\u0131, \u00f6l\u00e7\u00fcm yeri, \u00e7al\u0131\u015fma ko\u015fullar\u0131, s\u00fcre, elektriksel topoloji ve proje hedefine ba\u011fl\u0131d\u0131r.<\/p>\n<h3 style=\"margin:28px 0 12px\">Azaltma ekipman\u0131 yaln\u0131zca ba\u011fl\u0131 y\u00fcke g\u00f6re boyutland\u0131r\u0131labilir mi?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Hay\u0131r. Kapasite tart\u0131\u015fmas\u0131; \u00f6l\u00e7\u00fclm\u00fc\u015f mevcut davran\u0131\u015f\u0131, bir \u00e7al\u0131\u015fma profilini, kurulum topolojisini ve tan\u0131mlanm\u0131\u015f bir proje amac\u0131n\u0131 gerektirir.<\/p>\n<h3 style=\"margin:28px 0 12px\">Bu makale, bir uyum veya operasyonel sonucun elde edilece\u011fini garanti ediyor mu?<\/h3>\n<p style=\"margin:0 0 16px;line-height:1.7\">Hay\u0131r. Standart uygulamas\u0131, a\u011f ko\u015fullar\u0131, kabul kriterleri ve devreye alma, spesifik proje i\u00e7in tan\u0131mlanmal\u0131 ve do\u011frulanmal\u0131d\u0131r.<\/p>\n<h2 style=\"margin:42px 0 14px;scroll-margin-top:96px\" id=\"references\">Kaynak\u00e7a<\/h2>\n<ul style=\"margin:0 0 18px 1.2em;line-height:1.7\">\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/standards.ieee.org\/ieee\/519\/5892\/\" rel=\"nofollow noopener\" target=\"_blank\">IEEE 519 \u2014 Elektrik G\u00fc\u00e7 Sistemlerinde Harmonik Kontrol\u00fcne \u0130li\u015fkin \u00d6nerilen Uygulamalar ve Gereklilikler<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.nema.org\/standards\/view\/motors-and-generators\" rel=\"nofollow noopener\" target=\"_blank\">NEMA MG 1 \u2014 Motorlar ve Jenerat\u00f6rler<\/a><\/li>\n<li style=\"margin:0 0 8px\"><a href=\"https:\/\/www.energy.gov\/eere\/amo\/industrial-efficiency-and-decarbonization-office\" rel=\"nofollow noopener\" target=\"_blank\">ABD Enerji Bakanl\u0131\u011f\u0131 \u2014 End\u00fcstriyel Verimlilik ve Karbonsuzla\u015ft\u0131rma Ofisi<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Power quality metering is the evidence base for any APF or SVG inquiry. Before a mitigation RFQ is issued, the site team should log where each measurement was taken, which operating states were covered, how long the meter ran, and what the harmonic spectrum and reactive-power trend looked like at the point of common coupling. [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_gspb_post_css":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-2566","post","type-post","status-publish","format-standard","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":7}},"acf":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/posts\/2566","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/comments?post=2566"}],"version-history":[{"count":1,"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/posts\/2566\/revisions"}],"predecessor-version":[{"id":2605,"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/posts\/2566\/revisions\/2605"}],"wp:attachment":[{"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/media?parent=2566"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/categories?post=2566"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnbygele.com\/tr\/wp-json\/wp\/v2\/tags?post=2566"}],"curies":[{"name":"Naber","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}