Blog

NEC Checks for Harmonic Mitigation Equipment Installation 27
Jul

NEC Checks for Harmonic Mitigation Equipment Installation

U.s. installation review points for harmonic mitigation equipment should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate, or a···

Read More
EV Fleet Depot Charging Harmonics and Reactive Power at PCC 27
Jul

EV Fleet Depot Charging Harmonics and Reactive Power at PCC

An EV fleet depot aggregates tens or hundreds of chargers behind one point of common coupling, so its harmonic current and reactive-power demand rise and fall with charging schedules rather···

Read More
SVG Enclosure Thermal Rating for Harsh Industrial Sites 26
Jul

SVG Enclosure Thermal Rating for Harsh Industrial Sites

Environmental and thermal integration inputs for svg enclosures should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate, or a···

Read More
Colocation Data Center Power Quality: Shared Bus Planning 26
Jul

Colocation Data Center Power Quality: Shared Bus Planning

In a colocation data center, tenants share medium- and low-voltage buses, so one tenant's rectifier load can shape the power quality another tenant sees. Planning shared-bus mitigation starts with defining···

Read More
Active Harmonic Filter CT Placement and Wiring Guide 25
Jul

Active Harmonic Filter CT Placement and Wiring Guide

Ct location, polarity, wiring, and commissioning evidence for apf integration should begin with a documented electrical boundary, representative operating record, and a defined decision. A meter reading, a component nameplate,···

Read More