Blog

Reviewing Contactor Duty When Capacitor Banks See Harmonics 14
Aug

Reviewing Contactor Duty When Capacitor Banks See Harmonics

A capacitor switching contactor is reviewed as part of a circuit, not as an isolated catalog label. When harmonic-producing loads and capacitor stages share a system, the useful starting evidence···

Read More
How to Review Compound-Switch Records Alongside an APF 14
Aug

How to Review Compound-Switch Records Alongside an APF

Intermittent switching and harmonic observations become useful only when they can be traced to the same part of the electrical system. An intelligent compound switch log beside an APF should···

Read More
Before-and-After Comparison Method for APF and SVG Projects 13
Aug

Before-and-After Comparison Method for APF and SVG Projects

A before-and-after APF or SVG comparison is only as useful as its comparison basis. The pre and post records should answer the same question at the same electrical boundary, using···

Read More
Capture Intermittent Harmonic Events with Reviewable Records 13
Aug

Capture Intermittent Harmonic Events with Reviewable Records

Intermittent-load investigations often need more than a long average trend. Event-triggered harmonic logging can preserve what happened at a named electrical boundary when a defined condition occurred, provided that the···

Read More
Power Quality Baseline Report Template for a Mitigation RFQ 12
Aug

Power Quality Baseline Report Template for a Mitigation RFQ

A power-quality baseline report should let a reviewer reconstruct the measurement context before discussing mitigation. The useful question is not whether a file has many charts; it is whether the···

Read More